S05 -- In-Room Terminal Systems (I-P) PDF

S05 -- In-Room Terminal Systems (I-P) PDF

Name:
S05 -- In-Room Terminal Systems (I-P) PDF

Published Date:
2024

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$16.5
Need Help?
Very early in the design process, the HVAC design engineer must analyze and ultimately select appropriate systems, as discussed in Chapter 1. Next, production of heating and cooling is selected as decentralized (see Chapter 2) or centralized (see Chapter 3). Finally, distribution of heating and cooling to the end-use space can be done by an all-air system (see Chapter 4), or a variety of all-water or air/water systems and local terminals, as discussed in this chapter. (Note: all chapters mentioned are in the 2024 ASHRAE Handbook -- HVAC Systems and Equipment.) System Characteristics System Components and Configurations Secondary-Water Distribution Piping Arrangements Fan-Coil Unit and Unit Ventilator Systems Variable-Refrigerant-Flow (VRF) Units Chilled-Beam Systems Radiant-Panel Heating Systems Radiant-Floor Heating Systems Induction Unit Systems Supplemental Heating Units Primary-Air Systems Performance Under Varying Load Changeover Temperature Two-Pipe Systems with Central Ventilation Four-Pipe Systems Automatic Controls and Building Management Systems Maintenance Management Systems and Building System Commissioning
File Size : 1 file , 1.8 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 16
Product Code(s) : D-S052024IP
Published : 2024
Units of Measure : I-P

History


Related products


Best-Selling Products

Carbon Steel, Wire & Rods
Published Date: 08/01/1993
History of Ironmaking
Published Date: 01/01/2000
$30.3
ISS 213
Published Date: 01/01/2000
Strip Steel: Steel Products Manual
$23.7
ISS 218
Published Date: 08/01/1981
ISS Steel Products Manual: Cold Rolled Flat Steel Wire