S07 -- Combined Heat and Power Systems (I-P) PDF

S07 -- Combined Heat and Power Systems (I-P) PDF

Name:
S07 -- Combined Heat and Power Systems (I-P) PDF

Published Date:
2024

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$16.5
Need Help?
This chapter describes the increasing role of combined heat and power (CHP) in sustainable design strategies, presents typical system designs, provides means and methods to understand system performance, and describes prime movers, such as reciprocating and Stirling engines, combustion and steam turbines, and fuel cells, and their characteristics for various uses. It also describes thermally activated technologies (TAT) such as heat recovery, absorption chillers, steam turbine-driven chillers, and desiccant dehumidifiers, as well as organic Rankine cycle (ORC) machines for waste heat recovery. Related issues, such as fuels, lubricants, instruments, noise, vibration, emissions, and maintenance, are discussed for each type of prime mover. Siting, interconnection, installation, and operation issues are also discussed. Thermal distribution systems are presented in Chapters 12 and 13 of the 2024 ASHRAE Handbook -- HVAC Systems and Equipment. Additional, in-depth guidance for CHP planning and design is provided in ASHRAE’s (2015) Combined Heat and Power Design Guide. Terminology CHP System Concepts Performance Parameters Fuel-to-Power Components Thermal-to-Power Components Thermal-to-Thermal Components Electrical Generators and Components System Design Codes and Installation Economic Evaluation
File Size : 1 file , 13 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 56
Product Code(s) : D-S072024IP
Published : 2024
Units of Measure : I-P

History


Related products


Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138