SE-14-C029 -- Eight Years of Operation of 615 Ton Geothermal Nursing Home in Northern Tier PDF

SE-14-C029 -- Eight Years of Operation of 615 Ton Geothermal Nursing Home in Northern Tier PDF

Name:
SE-14-C029 -- Eight Years of Operation of 615 Ton Geothermal Nursing Home in Northern Tier PDF

Published Date:
2014

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

A 243,000 square foot (23,600 m2) geothermal heat pump nursing hospital in northern New Hampshire becamefirst operational during 2006. Patient rooms in this four story building have direct standing column welli (SCW) wellwater to each of the 236 geothermal heat pumps. Two bed patient suites each utilize a separate 2 or 3 ton heat pump.Separate heat pumps are utilized to isolate potential room to room contagion. The standing column well earthcoupling system was designed for a low, five percent, advective bleedii to avoid NPDES permitting requirements. ByNew Hampshire State codes, commercial geothermal bleed volumes are monitored and recorded. Stabilizing annualaverage entering earth water temperatures extremes and annual increases, aka "temperature creep", and its ease ofmitigation by small periodic advective ground water flow is discussed. No automatic bleed has been required since thestart of the geothermal system.

The paper will report on standing column well temperatures and their thermal transfer performance during arecent three year period; discuss reasons for avoided well temperature stabilizing "bleed"; constructionmethods/management and operational energy use. Two standing column well fields of eight standing columns each,16 SCW, serve a north and south side of the building, differing daily and annual temperature profiles and results fromapparent solar loads are provided for this paper. During the eight year operational period the entering watertemperatures have averaged in the 50°F (10°C) to 72°F (22°C) range. Early-on electrical and control issues andproblems and their resolutions are also reviewed.


File Size : 1 file , 2.3 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 8
Product Code(s) : D-SE-14-C029
Published : 2014

History


Related products


Best-Selling Products

IAPMO 150-2007
Published Date: 2007
Vacuum Sewage, Grease Waste and/or Condensate Collection Systems
$19.5
IAPMO 2012 Green Plumbing and Mechanical Code Supplement
Published Date: 04/01/2012
2012 Green Plumbing and Mechanical Code Supplement - For Use with All Codes
$18.3
IAPMO /ANSI/CAN/ASSE 1055-2020
Published Date: 2020
Performance Requirements for Chemical Dispensers with Integral Backflow Protection
$13.5
IAPMO /ANSI/CAN/ASSE 1055-2020
Published Date: 2023
Performance Requirements for Chemical Dispensers with Integral Backflow Protection
$13.5
IAPMO /ANSI/CAN/ASSE 1103-2024
Published Date: 2024
Performance Requirements for Pilot Operated Water Pressure Reducing Valves for Potable Water
$13.5
IAPMO /ANSI/CAN/ISO 30500:2019
Published Date: 2019
Non-sewered sanitation systems - Prefabricated integrated treatment units - General safety and performance requirements for design and testing (ISO 30500:2018, IDT)
$66