SF-98-01-3 -- Ground-Coupled Heat Pump Loop Design Using Thermal Conductivity Testing and the Effect of Different Backfill Materials on Vertical Bore Length PDF

SF-98-01-3 -- Ground-Coupled Heat Pump Loop Design Using Thermal Conductivity Testing and the Effect of Different Backfill Materials on Vertical Bore Length PDF

Name:
SF-98-01-3 -- Ground-Coupled Heat Pump Loop Design Using Thermal Conductivity Testing and the Effect of Different Backfill Materials on Vertical Bore Length PDF

Published Date:
1998

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

Thermal conductivity testing was completed on four different vertical bore hole configurations, each 250 ft (76.2 m) deep with 3/4 in. (1.91 cm) SDR11 polyethylene (PE) pipe and U-tubes. The testing was conducted by adding a monitored amount of heat to 3 gpm (0.1893 L/s) of water over a two-day period for each vertical bore hole configuration. By monitoring the water temperature entering and exiting the loop, the effects of bore hole diameter and backfill material were used to size a ground-coupled heat pump (GCHP) loop heat exchanger. The bore holes had the following average temperatures after 48 hours: 6.5 in. (16.51 cm) diameter with standard bentonite grout, 96.7°F (35.94°C); 6.5 in. (16.51 cm) diameter with fine sand, 82.2°F (27.89°C); 4.75 in. (12.07 cm) diameter with standard bentonite, 91.6°F (33.11°C); 4.75 in. (12.07 cm) diameter with thermally improved bentonite grout, 86.2°F (30.11°C). After determining the thermal conductivity and diffusivity of the soil from the temperature data obtained, a commercially available GCHP software package was used to determine the required vertical loop length. The facility for which this vertical loop was designed, had a peak cooling load of 160 tons (563 kW). The ground area would only support 144 bore holes spaced 17 ft (5.18 m) apart. The bore hole diameter, backfill material, type of pipe, and virgin ground material all affect vertical loop length. For this project, using standard bentonite backfill instead of sand increased the loop length 49%. This equates to 13,680 ft (4170 m) more bore hole. The length of a GCHP loop field can be reduced by using sand or thermally improved bentonite grout instead of standard bentonite grout.

Units: Dual


File Size : 1 file , 84 KB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 13
Product Code(s) : D-7838
Published : 1998

History


Related products


Best-Selling Products

CFR 1/2CFR
Published Date: 01/01/2004
Code of Federal Regulations - Title 1, 1-500 (General Provisions, Title 2, Reserved) - Office of the Federal Register
$10.2
CFR 10CFR 1-50
Published Date: 01/01/2004
Code of Federal Regulations - Title 10 Part 1 - Part 50 (Energy)
$10.2
CFR 10CFR 1-50
Published Date: 01/01/2005
Code of Federal Regulations - Title 10 Part 1 - Part 50 (Energy)
$10.2
CFR 10CFR 1-50
Published Date: 01/01/2006
Code of Federal Regulations - Title 10 Part 1 - Part 50 (Energy)
$10.2
CFR 10CFR 1-50
Published Date: 01/01/2007
Code of Federal Regulations - Title 10 Part 1 - Part 50 (Energy)
$10.2
CFR 10CFR 1-50
Published Date: 01/01/2008
Code of Federal Regulations - Title 10 Part 1 - Part 50 (Energy)
$10.2