SAE 1010 PDF

SAE 1010 PDF

Name:
SAE 1010 PDF

Published Date:
09/18/2020

Status:
Active

Description:

Standard Practice for Manpower and Personnel

Publisher:
SAE International

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$34.5
Need Help?
This Standard covers Manpower and Personnel (M&P) processes throughout planning, design, development, test, production, use, and disposal of a system. Depending on contract phase and/or complexity of the program, tailoring can be applied. The scope of this standard includes Prime and Sub-contractor M&P activities; it does not include Government M&P activities.
The primary goals of a contractor M&P program typically include:
  • Ensuring that the system design complies with the latest customer manpower estimates (numbers and mix of personnel, plus availability) and that discrepancies are reported to management and the customer.
  • Ensuring that the system design is regularly compared to the latest customer Personnel estimates (capabilities and limitations) and that discrepancies are reported to management and the customer.
  • Identifying, coordinating, tracking, and resolving M&P risks and issues and ensuring that they are:
    1. ¿¿¿
      Reflected in the contractor proposal, budgets, and plans.
    2. ¿¿¿
      Raised at design, management, and program reviews.
    3. ¿¿¿
      Debated in Working Group meetings.
    4. ¿¿¿
      Coordinated with Training, Logistics, and the other HSI disciplines.
    5. ¿¿¿
      Included appropriately in documentation and deliverable data items.
  • Identifying and pursuing opportunities to reduce Manpower and Personnel demands and costs.
  • Ensuring that M&P considerations are addressed in analyses, design decisions, trade-offs, and design changes (e.g., ECPs).
  • Conducting Manpower and Personnel analysis activities and supporting human factors analyses (e.g., workload analysis) and other HSI domain analyses to provide evidence to support design decisions and trade-offs and to coordinate shared data (e.g., task analyses).
  • Ensuring that M&P analyses and results are timely, technically competent/complete, and in a format that enables them to be included in design decisions, tradeoffs, and changes.
  • Ensuring that M&P issues discovered in test, evaluation, demonstration, Operational Test and Evaluation (OT&E), and operations are tracked and resolved in a technically competent/complete and timely manner.
  • Ensuring that the subjects used in experiments, simulations, tests, evaluations, and demonstrations are consistent with the customer¿¿¿s latest projected target audiences.

File Size : 1 file , 550 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Published : 09/18/2020

History

SAE 1010A
Published Date: 12/13/2023
Standard Practice for Manpower and Personnel
$40.8
SAE 1010
Published Date: 09/18/2020
Standard Practice for Manpower and Personnel
$37.2
SAE 1010
Published Date: 09/18/2020
Standard Practice for Manpower and Personnel
$34.5

Related products

SAE ARP4102
Published Date: 07/10/2007
FLIGHT DECK PANELS, CONTROLS, AND DISPLAYS
$28.2
SAE AS1293A
Published Date: 12/20/2023
SLEEVE, HOSE ASSEMBLY, CHAFE GUARD, TEE COIL (Stabilized: Dec 2023)
$14.7
SAE MA4044A
Published Date: 02/24/2018
NUT, SPANNER - END SLOTS, CUPWASHER LOCKED, UNS S66286, SILVER PLATED, MJ THREAD, METRIC (Stabilized: Feb 2018)
$17.1
SAE ARP4386D
Published Date: 07/18/2017
Terminology and Definitions for Aerospace Fluid Power, Actuation and Control Technologies
$50.4

Best-Selling Products