SAE 1010A PDF

SAE 1010A PDF

Name:
SAE 1010A PDF

Published Date:
12/13/2023

Status:
Active

Description:

Standard Practice for Manpower and Personnel

Publisher:
SAE International

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
sae-1010a_2578390

Choose Document Language:
40.80 €
Need Help?
This standard covers Manpower and Personnel (M&P) processes throughout planning, design, development, test, production, use, and disposal of a system. Depending on contract phase and/or complexity of the program, tailoring can be applied. The scope of this standard includes Prime and Subcontractor M&P activities; it does not include Government M&P activities. The primary goals of a contractor M&P program typically include:
  • Ensuring that the system design complies with the latest customer Manpower estimates (numbers and mix of personnel, plus availability) and that discrepancies are reported to management and the customer.
  • Ensuring that the system design is regularly compared to the latest customer personnel estimates (capabilities and limitations) and that discrepancies are reported to management and the customer.
  • Identifying, coordinating, tracking, and resolving M&P risks and issues and ensuring that they are:
    1. ○ Reflected in the contractor proposal, budgets, and plans.
    2. ○ Raised at design, management, and program reviews.
    3. ○ Debated in Working Group meetings.
    4. ○ Coordinated with Training, Logistics, and the other HSI disciplines.
    5. ○ Included appropriately in documentation and deliverable data items.
  • Identifying and pursuing opportunities to reduce Manpower and Personnel demands and costs.
  • Ensuring that M&P considerations are addressed in analyses, design decisions, trade-offs, and design changes (e.g., ECPs).
  • Conducting Manpower and Personnel analysis activities and supporting human factors analyses (e.g., workload analysis) and other HSI domain analyses to provide evidence to support design decisions and trade-offs and to coordinate shared data (e.g., task analyses).
  • Ensuring that M&P analyses and results are timely, technically competent/complete, and in a format that enables them to be included in design decisions, tradeoffs, and changes.
  • Ensuring that M&P issues discovered in test, evaluation, demonstration, Operational Test and Evaluation (OT&E), and operations are tracked and resolved in a technically competent/complete and timely manner.
  • Ensuring that the subjects used in experiments, simulations, tests, evaluations, and demonstrations are consistent with the customer’s latest projected target audiences.

File Size : 1 file , 730 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Published : 12/13/2023

History

SAE 1010A
Published Date: 12/13/2023
Standard Practice for Manpower and Personnel
40.80 €
SAE 1010
Published Date: 09/18/2020
Standard Practice for Manpower and Personnel
37.20 €
SAE 1010
Published Date: 09/18/2020
Standard Practice for Manpower and Personnel
34.50 €

Related products

SAE ARP572
Published Date: 12/01/1992
ELBOW ASSEMBLY - SHIELDED SPARK PLUG - .750-20 THREAD
9.90 €
SAE MA2002B
Published Date: 11/12/2013
Impulse Testing of Hydraulic Hose, Tubing and Fitting Assemblies
22.20 €
SAE AS6456
Published Date: 01/23/2018
Aerospace Analog Fiber Optic Link
26.10 €

Best-Selling Products

Bridge Loads
Published Date: 11/01/2000
43.50 €
Illustrated Encyclopedia of Building Services
Published Date: 09/01/1994
50.40 €
Laboratories : A Briefing & Design Guide
Published Date: 12/01/1994
31.50 €
Prevention of Reflective Cracking in Pavements
Published Date: 04/01/1998
41.70 €
Tunnelling : Management by Design
Published Date: 06/01/2000
28.50 €