UL 107 PDF

UL 107 PDF

Name:
UL 107 PDF

Published Date:
01/01/1993

Status:
Active

Description:

Asbestos-Cement Pipe and Couplings

Publisher:
Underwriters Laboratories

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$265.65
Need Help?
Please note: All interim revisions for this edition available at time of your purchase will be included.

By order of the publisher, historical UL documents are not returnable for any reason. Once you place an order for an historical document, we cannot issue a refund, credit, or exchange of any kind.

These requirements in UL 107 cover individually enclosed air-break switches, having all current-carrying part s enclosed, manually operable by means of external handles, and intended to be employed in accordance with the National Electrical Code. They may have provisions for being tripped electrically.

These req uirements also cover dead-front switches that have all current-carrying parts enclosed when mounted in an enclosed panelboard, dead-front switchboard or the like. These switches are manuall y operable by means of external handles or are hinged pullout switches and are intended to be employed in accordance with the National Electrical Code. A dead-front switch other than a hinged pullout switch may have provisions for being tripped electrically.

These requirements cover enclosed switches with or without provision for plug or for cartridge-enclosed fuses.

These requirements cover e nclosed switches intended for general use and having ampere ratings, with or without horsepower ratings, and enclosed switches intended for motor-circuit use only and havin g horsepower ratings but no general use ampere ratings.

These requirements cover double-throw switches intended for use in optional standby systems in accordance with Article 702 of the National Electrical Code, ANSI/NFPA 70.
Edition : 4th
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 26
Published : 01/01/1993

History

UL 107
Published Date: 01/01/2001
Asbestos-Cement Pipe and Couplings
UL 107
Published Date: 01/01/1993
Asbestos-Cement Pipe and Couplings
$265.65

Related products

UL 2750
Published Date: 11/29/2023
Wireless Power Transfer Equipment for Electric Vehicles
$150.6

Best-Selling Products

CII BMM2001-10
Published Date:
Impacts of Design/Information Technology on Building and Industrial Projects
$36
CII BMM2002-10
Published Date: 11/01/2002
Measuring the Impacts of the Delivery System on Project Performance -- Design-Build and Design-Bid-Build
$36
CII BMM2002-3
Published Date: 02/01/2002
Benchmarking and Metrics Summary Report for 2001
$36
CII BMM2004-10
Published Date: 10/01/2004
Best Practices for Project Security
$36
CII BMM2006-10
Published Date: 07/01/2006
Lessons Learned in the Implementation of Best Practices for Project Security
$36
CII BMM2006-11
Published Date: 11/01/2006
Impacts of Automation and Integration Technologies on Project and Company Performance
$36