AWWA ACE60071 PDF

AWWA ACE60071 PDF

Name:
AWWA ACE60071 PDF

Published Date:
06/17/2004

Status:
Active

Description:

Selecting the Right Approach to Validation Testing: Three Options and Lessons Learned

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
This slide presentation outlines information on three options for validation testing. Topics covered include: ultraviolet (UV) reactor validation issues, approaches, costs, and pros/cons; off-site validation at manufacturer facility (case study of Seattle Public Utilities' Cedar Design-Build-Operate Project); off-site validation at test center (case study of Poughkeepsie's (NY) Water Treatment Facility); on-site validation (case studies of City of Henderson, Nevada and Clayton County Water Authority, Georgia); and a "hybrid" approach (case study of City of Winnipeg, Manitoba, Canada). Lessons learned include: validation testing is essential to prove UV disinfection effectiveness; US Environmental Protection Agency published detailed test protocol for implementation by primacy agencies, with flexibility for where validation testing is conducted; test conditions significantly impact operations costs; there are several different options available for testing, but there is no "one size fits all"; selecting approach is important step in project implementation; and, site-specific factors will influence the decision.
Edition : Vol. - No.
File Size : 1 file , 5 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 31
Published : 06/17/2004

History


Related products

AWWA ACE59842
Published Date: 06/17/2004
Water Utility Performance Standards: Criteria and Measurement
$7.2
AWWA ACE59877
Published Date: 06/17/2004
The Conservation Impact of Educational Programs in the Schools
$7.2
AWWA ACE59906
Published Date: 06/17/2004
Best Practices for the Reduction of SCADA System Total Lifecycle Cost
$7.2
AWWA ACE59912
Published Date: 06/17/2004
Permitting Massachusetts' First Desalination Facility - Challenges in Obtaining Approvals for Discharges to the Taunton River
$7.2

Best-Selling Products