AWWA ACE61849 PDF

AWWA ACE61849 PDF

Name:
AWWA ACE61849 PDF

Published Date:
06/17/2005

Status:
Active

Description:

Process and Planning Considerations for a Zero Liquid Discharge Low-Pressure Membrane Treatment Plant

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
San Diego County Water Authority (Water Authority) is planning to procure a new water treatment plant up to 100 million gallons per day (mgd) capacity using the design-build-operate (DBO) approach. The Water Authority identified the Twin Oaks Valley site for the construction of the new treatment plant. Giving due consideration to source water quality, treated water quality goals, site constraints and potential environmental impact, two alternative treatment trains were identified and evaluated under conceptual design: low-pressure membranes (microfiltration (MF)/ultrafiltration (UF)) with granular activated carbon (GAC) as polishing treatment; and, conventional treatment with intermediate ozonation. These two alternative trains would produce water that would consistently meet the water quality goals but would result in finished water of varying quality; however, the ultimate decision about process selection is left up to the proposing companies. Conceptual designs consisted of plant hydraulic profiles, design criteria, site layout and cost opinions for the two alternative treatment trains. The purposes of the conceptual designs were to serve as the basis for the Environmental Impact Report, and to provide preliminary cost opinions for the project. Because there is no sewer system at the proposed plant site, the conceptual designs had to be developed giving consideration to zero liquid discharge from the treatment plant. This paper focuses on the process and planning considerations for the conceptual design of the zero liquid discharge membrane treatment plant. The membrane treatment plant conceptual design consisted of two stages of submerged membrane treatment systems. The backwash water from Stage 1 (which is approximately 7 percent of the feed flow) would be sent to Stage 2. Stage 1 would have 6-8 membrane trains. Stage 2 would have 3 membrane trains. The product water from Stage 2 membrane treatment was assumed to be returned to the front of the treatment plant. It may be possible to get the State's approval to blend Stage 2 product water with Stage 1 product water. The backwash water from Stage 2 membranes and GAC would be sent through mechanical dewatering and solids handling facilities. The membrane clean-in-place (CIP) chemicals waste would be neutralized and blended with Stage 2 backwash water. The dewatering and solids handling facilities would thicken and dewater the Stage 2 membrane reject, CIP waste and intermittently treat the solids from the equalization basins that hold the spent backwash water from the GAC contactors. The solids handling facilities would include gravity thickener and centrifuges. The centrate and thickener return would be returned to the front of the treatment plant. The dewatered solids would be hauled away to a landfill. Includes table, figures.
Edition : Vol. - No.
File Size : 1 file , 1.7 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 11
Published : 06/17/2005

History


Related products

AWWA ACE61693
Published Date: 06/17/2005
Tracking Atrazine in the United States: Implications for Regulation
$7.2
AWWA ACE61715
Published Date: 06/17/2005
Commercial, Institutional, and Industrial Water Use in the Santa Clara Valley Water District
$7.2
AWWA ACE61754
Published Date: 06/17/2005
The Value of Reuse and Desal Water: Are They Worth the Cost?
$7.2
AWWA ACE61765
Published Date: 06/17/2005
Measuring Success through a Corporate Balanced Scorecard
$7.2

Best-Selling Products

ISO/IEC TS 15504-9:2011
Published Date: 08/01/2011
Information technology - Process assessment - Part 9: Target process profiles
$29.7
ISO/IEC TS 29140:2020
Published Date: 10/01/2020
Information technology for learning, education and training - Nomadicity and mobile technologies
$55.5