Charlotte County Utilities (CCU) is in the process of upgrading a reverse osmosis (RO) water treatment plant
(WTP) and well field that was a formerly privatized facility. Since the plant had been purchased
from a developer, the County needed a thorough assessment of the condition and capacity of
WTP and well field assets. The County was also deploying Datastream as their CMMS as a
separate project. It was decided by the Malcolm Pirnie Project Manager and CCU management
staff that data collected during the value engineering study could be best utilized if it were
managed in one location, in an easily accessible database that could later be used as a user
interface enhancement to the County's CMMS software. The County has 3D CAD files
developed by the previous owner's engineering consultant, but nothing in geographic information systems (GIS) at the plant level.
Based on available electronic information, and the current level of implementation of the
County's CMMS, Malcolm Pirnie provided the integration approach discussed in this paper. Includes figures.