AWWA ACE68697 PDF

AWWA ACE68697 PDF

Name:
AWWA ACE68697 PDF

Published Date:
11/01/2008

Status:
Active

Description:

A Quick Start to Utility-Wide Asset Management Planning and Implementation at Arapahoe County, Colorado

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The focus of this powerpoint presentation is on how ACWWA implemented the following: a utility-wide assessment of its asset management practices; a risk-based forecast of asset renewal needs; an enhanced business process for asset renewal planning; and, a review of IT systems to support asset management. ACWWA's asset management objectives included the following: alignment between service level delivery, staff activities and asset investments; defensible forecast of future asset renewal costs; improved understanding of existing asset risks; improved access to asset and business information; and, efficient and effective business processes. A 3-step project approach to meet ACWWA objectives is presented, along with ACWWA benefits and lessons learned. Includes figures.
Edition : Vol. - No.
File Size : 1 file , 2.6 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 25
Published : 11/01/2008

History


Related products

AWWA ACE68895
Published Date: 11/01/2008
Formation and Occurrence of Emerging Nitrogenous Disinfection Byproducts (N-DBPs)
$7.2
AWWA ACE68563
Published Date: 11/01/2008
A New Era in Great Lakes Water Treatment Plant Facility Design: The Integration of Technology, Environment and Community for the Municipality of West Elgin
$7.2
AWWA ACE69087
Published Date: 11/01/2008
Adapting to Changing Water Supply Circumstances in the Seattle Metropolitan Area
$7.2
AWWA ACE68821
Published Date: 11/01/2008
Improving Recovery in Reverse Osmosis Desalination: Treatment of Concentrate by Electrodialysis
$7.2

Best-Selling Products

BS ISO/IEC ISP 10607-1:1995
Published Date: 03/15/1997
Information technology. International standardized profiles AFTnn. File transfer, access and management-Specification of ACSE, presentation and session protocols for the use by FTAM
$57.15
BS ISO/IEC ISP 10608-14:1995
Published Date: 12/15/1995
Information technology. International standardized profile TAnnnn. Connection-mode transport service over connectionless-mode network service-MAC, PHY and PMD sublayer dependent and Station Management requirements over an FDDI LAN subnetwork
$79.248
BS ISO/IEC ISP 10608-5:1992
Published Date: 03/15/1994
Information technology. International standardized profile TAnnnn. Connection-mode transport service over connectionless-mode network service-TA1111/TA1121 profiles including subnetwork-dependent requirements for X.25 packet-switched data networks using virtual calls
$48.006
BS ISO/IEC ISP 10609-1:1992
Published Date: 01/15/1993
Information technology. International standardized profiles TB, TC, TD and TE. Connection-mode transport service over connection-mode network service-Subnetwork-type independent requirements for Group TB
$57.15
BS ISO/IEC ISP 10609-5:1992
Published Date: 01/15/1993
Information technology. International standardized profiles TB, TC, TD and TE. Connection-mode transport service over connection-mode network service-Definition of profiles TB1111/TB1121
$28.194
BS ISO/IEC ISP 10614-1:1995
Published Date: 11/15/1995
Information technology. International standardized profile RC. X.25 protocol relaying-Subnetwork-independent requirements
$57.15