AWWA CSC94014 PDF

AWWA CSC94014 PDF

Name:
AWWA CSC94014 PDF

Published Date:
01/01/1994

Status:
Active

Description:

Feasibility Study for SCADA System Implementation

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The purpose of the feasibility study was to provide the necessary determination for both the economic feasibility and intangible factors, needed for the development of a computer based supervisory control and data acquisition (SCADA) system. The SCADA system development was required to meet the Anne Arundel County water treatment and distribution system's present operational requirements and have the capability to be expanded to provide the evolutionary growth necessary to meet projected requirements.
File Size : 1 file
ISBN(s) : 0898677343
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 12
Published : 01/01/1994

History


Related products

AWWA CSC94038
Published Date: 01/01/1994
Maintenance Management and Main Replacement Planning at San Jose Water Company
$7.2
AWWA CSC94036
Published Date: 01/01/1994
Linking Hydraulic Network Models and SCADA Systems: The ABCs of System Integration
$7.2
AWWA CSC94035
Published Date: 01/01/1994
Competency Based Health & Safety Training Through Multimedia
$7.2
AWWA CSC94029
Published Date: 01/01/1994
Energy Management for Large-Scale Water Supply Systems
$7.2

Best-Selling Products