AWWA IMTECH64747 PDF

AWWA IMTECH64747 PDF

Name:
AWWA IMTECH64747 PDF

Published Date:
03/01/2007

Status:
Active

Description:

Best Practices for Successful Asset Management

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
This slide presentation begins by defining asset management as: life-cycle management, managing from planning to disposal, condition assessments, reliability centered, focus on design and engineering, "3 R's" - Repair, Rehab, or Replace, accounting management, focus on fiscal responsibility to customer, and GASB-34 Compliance. The presentation provides an international model that describes all of the functions that should be accomplished to manage the entire life of assets to receive the best return on investments. The presentation defines other terminology such as hierarchy of asset management sophistication, computerized maintenance management system (CMMS), and holistic approach. Two case studies are outlined, the first being the City of Chicago, Department of Water Management implementation of CMMS for Pumping Division, an Asset Centric utility is moving into phase 2 of implementation. The second case study is at the DuPage Water Commission, upgrade of CMMS for GASB34 compliance, GIS Integration, with the desire to implement Asset Management in a younger utility and when upgrade completed, focusing on Asset Management Plan. Includes tables, figures.
Edition : Vol. - No.
File Size : 1 file , 1.8 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 22
Published : 03/01/2007

History


Related products

AWWA IMTECH64735
Published Date: 03/01/2007
CUAHSI Hydrologic Information Systems
$7.2
AWWA IMTECH64733
Published Date: 03/01/2007
Leveraging GIS and Embedded Sensor Networks to Control Combined Sewer Overflow Events
$7.2
AWWA IMTECH64715
Published Date: 03/01/2007
The Selection of a Customer Information System (CIS): The Barbados Light & Power Experiences
$7.2
AWWA IMTECH64719
Published Date: 03/01/2007
Identifying the Costs of Customer Service
$7.2

Best-Selling Products

NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$0.3
NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$123.9
NEBB BUILDING SYSTEMS
Published Date:
Procedural Standards for Whole Building Systems Commissioning of New Construction
NEBB BUILDING SYSTEMS
Published Date: 01/01/2019
PROCEDURAL STANDARDS FOR WHOLE BUILDING SYSTEMS COMMISSIONING OF NEW CONSTRUCTION
$62.1