AWWA IMTECH64715 PDF

AWWA IMTECH64715 PDF

Name:
AWWA IMTECH64715 PDF

Published Date:
03/01/2007

Status:
Active

Description:

The Selection of a Customer Information System (CIS): The Barbados Light & Power Experiences

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
This slide presentation outlines the experience that Barbados Light & Power (on the Island of Barbados) had with selecting a customer information system (CIS). The reasons for considering replacement included: aging technology; retirement of critical support resources; changing customer requirements; functional limitations; continual need for process improvements; need for flexible rate management; new marketing initiatives; and, critical subsystem integration. Phase I of the high level approach for a CIS Solution included: Identify / Validate Drivers and Requirements; Conduct Comparative Analysis on the following options: Status Quo; Redesign; Outsource; and, Purchase. The approach for Phase Two: CIS Selection included: Refine Requirements for RFP; RFP Development and Publication; Pre-Bidding Meetings; Selection of Two Finalists; On-Site Demonstrations; Site Visits; and, Selection of the Final Vendor.
Edition : Vol. - No.
File Size : 1 file , 530 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 45
Published : 03/01/2007

History


Related products

AWWA IMTECH64735
Published Date: 03/01/2007
CUAHSI Hydrologic Information Systems
$7.2
AWWA IMTECH64723
Published Date: 03/01/2007
The Life and Death of Homer: Replacing AMR with AMR
$7.2
AWWA IMTECH64719
Published Date: 03/01/2007
Identifying the Costs of Customer Service
$7.2
AWWA IMTECH64722
Published Date: 03/01/2007
Project Meritage and Customer Impact
$7.2

Best-Selling Products

DOT 23 CFR PART 625
Published Date: 04/01/2020
DESIGN STANDARDS FOR HIGHWAYS
$9
DOT 23 CFR PART 645
Published Date: 04/01/2019
UTILITIES
$10.8
DOT 23 CFR PART 655
Published Date: 04/01/2018
TRAFFIC OPERATIONS
$9.3
DOT 33 CFR PART 127
Published Date: 07/01/2019
WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS
$11.7
DOT 33 CFR PART 154
Published Date: 07/01/2017
FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK
$18.3
DOT 33 CFR PART 154
Published Date: 07/01/2019
FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK
$18.3