AWWA JAW31494 PDF

AWWA JAW31494 PDF

Name:
AWWA JAW31494 PDF

Published Date:
01/01/1992

Status:
Active

Description:

Journal AWWA - Mass Transport Considerations for Pressure-Driven Membrane Processes

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$9
Need Help?
Numerical simulations and experimental work for evaluating transport mechanisms for colloidal foulants in pressure-driven membrane systems are discussed. A model for concentration polarization is used to explore the role of ionic strength in determining the distribution of dissolved humic materials near a rejecting membrane. Particle trajectory theory predicts that there should exist a critical particle size above which particles will not deposit on the membrane. For conditions typical of ultrafiltration and microfiltration, which operate in laminar flow and utilize an inside-out geometry, this critical particle diameter is likely to be in the range of 10-50 um. Qualitative evidence, based on measurements of permeate flux, supports the theoretical minimum in diffusive back-transport of particles predicted to occur for particles near 0.1 um in size. Includes 24 references, figures.
Edition : Vol. 84 - No. 1
File Size : 1 file , 1.8 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 8
Published : 01/01/1992

History


Related products

AWWA JAW10891
Published Date: 04/01/1984
Journal AWWA - Developing Joint Water Projects
$9
AWWA JAW31495
Published Date: 01/01/1992
Journal AWWA - Selective Alum Recovery from Clarifier Sludge
$9
AWWA JAW31493
Published Date: 01/01/1992
Journal AWWA - Removing Color From a Groundwater Source
$9
AWWA JAW31492
Published Date: 01/01/1992
Journal AWWA - SOC Removal in a Membrane Softening Process
$9

Best-Selling Products

FORD AWX
Published Date: 12/01/1993
WIRE, TAMPICO, AND SYNTHETIC FILAMENT POWER WHEEL BRUSHES APPLICATIONS AND GENERAL INFORMATION
$9
FORD B2BBX
Published Date: 09/01/1991
ONE-STEP PAINT LINE CLEANING PROCEDURE
$9
FORD B2F1
Published Date: 02/01/1978
ANODIC ELECTROCOATING SYSTEM CLEANING AND MAINTENANCE
$9
FORD B2GX
Published Date: 04/01/1984
PAINT BAKE OVENS CLEANING AND MAINTENANCE
$9
FORD BAX-1
Published Date: 07/01/1977
PAINT SPRAYING SYSTEMS, SMALL PARTS, AUTOMATIC
$9
FORD BAX-2
Published Date: 07/01/1985
PAINT SPRAY BOOTH BACK SECTION ACCEPTANCE TEST
$9