AWWA JOINT53613 PDF

AWWA JOINT53613 PDF

Name:
AWWA JOINT53613 PDF

Published Date:
01/01/2001

Status:
Active

Description:

Activity Based Costing (ABC): A Success Story

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
Utilities that were once insulated from the pressures ofcompetition, efficient operation and effective management now must contend with significant challenges including deregulation, privatization, and outsourcing. To that end, utilities need to emulate the corporate business model of minimizing the input of resources while maximizing the output of services provided. Consequently, many utilities face the daunting task of reevaluating operating costs, eliminating operational inefficiencies and enhancing competitiveness. In an emerging competitive environment, the real risk to many utilities is not so much the mushrooming of private service providers but the lack of understanding of their own competitive positioning in the industry. The Water Customer Services Division (CSD) of the City of Phoenix, Arizona, is a case in point. This paper provides a brief description of CSD and its proactive Continuous Improvement Process and discusses in depth CSD's success in using Activity Based Costing (ABC) as an effective management tool as part of its continuous improvement process efforts. Includes 3 references, tables, figures.
Edition : Vol. - No.
File Size : 1 file
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 18
Published : 01/01/2001

History


Related products

AWWA JOINT53580
Published Date: 01/01/2001
Customers as Advocates--Here's How
$7.2
AWWA JOINT53574
Published Date: 01/01/2001
The Impact of Water Industry De-Regulation Upon Strategic Planning and Organizational Design
$7.2
AWWA JOINT53563
Published Date: 01/01/2001
How to Develop and Implement an Affirmative Action Plan: "A Louisville Water Company Case Study"
$7.2
AWWA JOINT53384
Published Date: 01/01/2001
Reducing Cost Through Labor-Management Teamwork and the Use of Best Practices
$7.2

Best-Selling Products

SMACNA 1378
Published Date: 01/01/1995
Thermoplastic Duct (PVC) Construction Manual
$42
SMACNA - TAB Procedural Guide
Published Date: 2024
$36