AWWA MTC69773 PDF

AWWA MTC69773 PDF

Name:
AWWA MTC69773 PDF

Published Date:
11/01/2009

Status:
Active

Description:

Membrane Technology Takes Reclamation to the Limit

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
awwa-mtc69773_1700453

Choose Document Language:
7.20 €
Need Help?
This powerpoint presentation begins by providing a brief overview of the Orange County Water District (OCWD) located in Fountain Valley, California, and the OCWD Recharge Program. The history of reuse at OCWD is outlined, along with GWR System Components, GWR System Advanced Water Purification Process, GWRS CMF-S microfiltration (MF) system design, reverse osmosis system, ultraviolet (UV)/advanced oxidation system, MF and UV system design and equipment procurement, California Department of Public Health (CDPH) and regional board requirements, operating the GWR system, water quality produced by GWR system, GWRS product water quality including hormones, endocrine disrupting chemicals, and pharmaceuticals, estimated capital and O&M costs, and federal, state and local funding. Includes tables.
Edition : Vol. - No.
File Size : 1 file , 3.6 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 36
Published : 11/01/2009

History


Related products

AWWA MTC69651
Published Date: 11/01/2009
Retrofitting with MF/UF Membranes: The Singaporean Way
7.20 €
AWWA MTC69793
Published Date: 11/01/2009
Being a Smart Buyer: Low Pressure Membrane System Procurement
7.20 €
AWWA MTC69721
Published Date: 11/01/2009
Application of Ceramic Membrane Microfiltration for Drinking Water Production in Japan and Pretreatment by Super-Powdered Activated Carbon Adsorption for Ceramic Membrane Filtration
7.20 €
AWWA MTC69749
Published Date: 11/01/2009
One Water Source, Six Utilities, and Seven Different Membrane Filtration Systems: Lessons Learned from Full-Scale Operation
7.20 €

Best-Selling Products

FCI 13-1-2022
Published Date: 2022
Determining Condensate Loads to Size Steam Traps
66.00 €
FCI 15-1-2020
Published Date: 2020
Standard for Production Testing of Pressure Regulators
49.50 €
FCI 17-1-2018
Published Date: 10/01/2018
Standard for Production Testing of Sanitary Pressure Regulators
33.00 €
FCI 18-1-2021
Published Date: 2021
Standard for Sizing and Selection of Type 1 Secondary Pressure Drainers
33.00 €
FCI 18-2-2020
Published Date: 2020
Standard for Installation of Type 1 Secondary Pressure Drainers
33.00 €