DNV DNV-RP-F116 PDF

DNV DNV-RP-F116 PDF

Name:
DNV DNV-RP-F116 PDF

Published Date:
02/01/2015

Status:
[ Revised ]

Description:

Integrity management of submarine pipeline systems

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
dnv-dnv-rp-f116_2793607

Choose Document Language:
43.50 €
Need Help?

Scope and application

This recommended practice gives guidance which can be applied to establish, implement and maintain the Integrity Management System

This recommended practice is applicable to rigid steel pipeline systems, and its associated pipeline components, as defined in DNV-OS-F101 (Sec.1 C343 and C292, and Appendix F). It covers structural and containment failures, and threats that may lead to such failures.

The main focus is on the integrity management process; i.e. the combined process of threat identification, risk assessment, planning, inspection, monitoring, testing, integrity assessment, mitigation, intervention, and repair. Maintenance activities for e.g. topsides controls, chemical systems, and valves which may affect pipeline system integrity are not explicitly covered by this RP.

The integrity management system described herein may also be applicable to rigid risers, however, for details; reference is given to DNV-RP-F206 Riser Integrity Management, which also covers flexible risers.

This document covers (main/trunk) transport lines and in-field lines, which consist of:

- export lines (oil & gas, multi-phase),

- production lines (oil & gas, multi-phase) or

- utility / service lines (gas injection, gas lift, water injection, produced water, chemicals).


Edition : 15
File Size : 1 file , 1.9 MB
Number of Pages : 141
Published : 02/01/2015

History

DNV DNV-RP-F116
Published Date: 12/01/2021
Integrity management of submarine pipeline systems
43.50 €
DNV DNVGL-RP-F116
Published Date: 09/01/2019
Integrity management of submarine pipeline systems
43.50 €
DNV DNVGL-RP-F116
Published Date: 05/01/2017
Integrity management of submarine pipeline systems
43.50 €
DNV DNV-RP-F116
Published Date: 02/01/2015
Integrity management of submarine pipeline systems
43.50 €
DNV DNV-RP-F116
Published Date: 10/01/2009
INTEGRITY MANAGEMENT OF SUBMARINE PIPELINE SYSTEMS
43.50 €

Related products

DNV DNV-RP-F302
Published Date: 04/01/2010
SELECTION AND USE OF SUBSEA LEAK DETECTION SYSTEMS
43.50 €
DNV DNVGL-RP-N104
Published Date: 05/01/2017
Ballast, Stability, and Watertight Integrity - Planning and Operating Guidance
17.10 €
DNV DNV CLASSIFICATION NOTES 31.11
Published Date: 07/01/2016
Strength Analysis of Liquefied Gas Carriers with Independent Type A Prismatic Tanks
17.10 €

Best-Selling Products

AHRI 1010-94
Published Date: 01/01/1994
Self-Contained, Mechanically Refrigerated Drinking-Water Coolers
7.50 €
AHRI 1060-00
Published Date: 01/01/2000
Rating Air-to-Air Energy Recovery Ventilation Equipment
13.50 €
AHRI 1060-01
Published Date: 09/01/2001
Rating Air-to-Air Heat Exchangers for Energy Recovery Ventilation Equipment
8.70 €
AHRI 1060-2005
Published Date: 2005
Performance Rating of Air-To-Air Heat Exchangers for Energy Recovery Ventilation Heat Equipment
6.90 €
AHRI 1060-2011
Published Date: 2011
Performance Rating of Air-To-Air Heat Exchangers for Energy Recovery Ventilation Heat Equipment (I-P) (AHRI)
6.90 €
AHRI 1060-2013
Published Date: 2013
Performance Rating of Air-To-Air Heat Exchangers for Energy Recovery Ventilation Heat Equipment (I-P) (AHRI)
6.90 €