Name:
DNV DNVGL-RP-F116 PDF
Published Date:
05/01/2017
Status:
[ Revised ]
Publisher:
DNV
Scope and application
This recommended practice gives guidance which can be applied to establish, implement and maintain the Integrity Management System
This recommended practice is applicable to rigid steel pipeline systems, and its associated pipeline components, as defined in DNVGL-ST--F101 (Sec.1 C343 and C292, and App.F). It covers structural and containment failures, and threats that may lead to such failures.
The main focus is on the integrity management process; i.e. the combined process of threat identification, risk assessment, planning, inspection, monitoring, testing, integrity assessment, mitigation, intervention, and repair. Maintenance activities for e.g. topsides controls, chemical systems, and valves which may affect pipeline system integrity are not explicitly covered by this RP.
The integrity management system described herein may also be applicable to rigid risers, however, for details; reference is given to DNVGL-RP-F206 Riser Integrity Management, which also covers flexible risers.
This document covers (main/trunk) transport lines and in-field lines, which consist of:
— export lines (oil and gas, multi-phase),
— production lines (oil and gas, multi-phase) or
— utility/service lines (gas injection, gas lift, water injection, produced water, chemicals).
| Edition : | 17 |
| File Size : | 1 file , 2.4 MB |
| Number of Pages : | 189 |
| Published : | 05/01/2017 |