DNV DNVGL-RP-F116 PDF

DNV DNVGL-RP-F116 PDF

Name:
DNV DNVGL-RP-F116 PDF

Published Date:
09/01/2019

Status:
[ Revised ]

Description:

Integrity management of submarine pipeline systems

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$43.5
Need Help?
W/D S/S BY DNV-RP-F116 * NO LONGER AVAILABLE

Scope and application

This recommended practice gives guidance which can be applied to establish, implement and maintain the Integrity Management System.

This recommended practice is applicable to rigid steel pipeline systems, and its associated pipeline components, as defined in DNVGL-ST--F101 (Sec.1 C343 and C292, and App.F). It covers structural and containment failures, and threats that may lead to such failures.

The main focus is on the integrity management process; i.e. the combined process of threat identification, risk assessment, planning, inspection, monitoring, testing, integrity assessment, mitigation, intervention, and repair. Maintenance activities for e.g. topsides controls, chemical systems, and valves which may affect pipeline system integrity are not explicitly covered by this RP.

The integrity management system described herein may also be applicable to rigid risers, however, for details; reference is given to DNVGL-RP-F206 Riser Integrity Management, which also covers flexible risers.

This document covers (main/trunk) transport lines and in-field lines, which consist of:

— export lines (oil and gas, multi-phase),

— production lines (oil and gas, multi-phase) or

— utility/service lines (gas injection, gas lift, water injection, produced water, chemicals).

Submarine pipeline system

It is the responsibility of the pipeline operator to clearly define the pipeline system limits/interfaces (battery limits – also see Sec.3 [3.1.3]), however a submarine pipeline system typically extends to the first weld beyond:

— the first valve, flange or connection above water on platform or floater

— the connection point to the subsea installation (i.e. piping manifolds are not included)

— the first valve, flange, connection or isolation joint onshore unless otherwise specified by legislation.


Edition : 19
File Size : 1 file , 2.5 MB
Number of Pages : 189
Published : 09/01/2019

History

DNV DNV-RP-F116
Published Date: 12/01/2021
Integrity management of submarine pipeline systems
$43.5
DNV DNVGL-RP-F116
Published Date: 09/01/2019
Integrity management of submarine pipeline systems
$43.5
DNV DNVGL-RP-F116
Published Date: 05/01/2017
Integrity management of submarine pipeline systems
$43.5
DNV DNV-RP-F116
Published Date: 02/01/2015
Integrity management of submarine pipeline systems
$43.5
DNV DNV-RP-F116
Published Date: 10/01/2009
INTEGRITY MANAGEMENT OF SUBMARINE PIPELINE SYSTEMS
$43.5

Related products

DNV DNV-RU-YACHT PART 3 CHAPTER 3
Published Date: 07/01/2022
Part 3 Hull - Chapter 3 Hull design loads
$17.1
DNV DNV-RU-SHIPS PART 3 CHAPTER 11
Published Date: 07/01/2024
Part 3 Hull - Chapter 11 Hull equipment, supporting structure and appendages
$17.1
DNV DNV CLASSIFICATION NOTES 57.2
Published Date: 08/01/2012
Full Scale Testing of Escort Vessels
$17.1
DNV GL NAVAL SHIP TECHNOLOGY III-2-3
Published Date: 03/01/2005
III-Rules for Classification and Construction Naval Ship Technology Part 2-Sub-Surface Ships Chapter 3-Guidelines for Air Independent Power Systems for Underwater Use
$17.1

Best-Selling Products

BRE AP100
Published Date: 01/01/1995
Pfa concrete; Set of four reports (BR294 to BR297)
$19.5
BRE AP135
Published Date: 01/01/2000
Value management
$15.9
BRE AP138
Published Date: 01/01/2000
BR358 Quiet homes & BR406 Specifying dwellings with enhanced sound insulation
$17.1
BRE AP139
Published Date: 01/01/2000
Domestic energy fact file; Set of four reports
$41.4
BRE AP146
Published Date: 01/01/2002
Managing sustainable construction; Profiting from sustainability
$9.3
BRE AP147
Published Date: 01/01/2002
Thaumasite in cementitous materials; Proceedings of the first international conference BRE 19-21 June 2002
$87.3