DNV DNV-RP-G107 PDF

DNV DNV-RP-G107 PDF

Name:
DNV DNV-RP-G107 PDF

Published Date:
09/01/2019

Status:
[ Active ]

Description:

Efficient updating of risk assessments

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$43.5
Need Help?

This RP focuses on recommendations for updating risk assessments during the operational phase of a facility by assessing the effect of changes in the risk assessment basis, using a combination of qualitative and quantitative methods to deliver the decision basis. A three-phase approach has been defined covering the following: screening, re-assessment and implementation, see Figure 1-2.

The purpose of the screening phase is to identify changes to the operational conditions and design basis in order to establish if the effects of these changes are understood and/or critical. This is then used as input for deciding whether updates are necessary. The purpose of the re-assessment phase is to ensure that a sufficient basis for effective risk management is in place for follow-up in the implementation phase.

There are essentially three types of changes that can occur. Firstly, the operational or technical conditions may change, directly affecting the risk level. Secondly, new knowledge acquired may influence the assessment of the risk level. Thirdly, there could be changes to the context, e.g. new regulatory or stakeholder requirements, new risk treatment options etc., affecting the tolerability of risks. Different actions may be required, depending on the type of changes.


Edition : 19
File Size : 1 file , 1.1 MB
Number of Pages : 32
Published : 09/01/2019

History

DNV DNV-RP-G107
Published Date: 09/01/2019
Efficient updating of risk assessments
$43.5
DNV DNVGL-RP-G107
Published Date: 09/01/2019
Efficient updating of risk assessments
$43.5
DNV DNVGL-RP-G107
Published Date: 11/01/2016
Efficient updating of risk assessments
$43.5

Related products

DNV DNV TAP NO. MR-E006
Published Date: 01/01/2014
Fuses
$17.1
DNV DNV-RU-SHIPS/HSLC PART 6 CHAPTER 11
Published Date: 01/01/2011
NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS - ADDITIONAL CLASS Hull Monitoring Systems
DNV DNV-RU-SHIPS PART 2 CHAPTER 2
Published Date: 07/01/2024
Part 2 Materials and welding - Chapter 2 Metallic materials
$17.1

Best-Selling Products

ICAC EP-7
Published Date: 01/01/2004
ELECTROSTATIC PRECIPITATOR GAS FLOW MODEL STUDIES
ICAC EP-8
Published Date: 11/01/1993
Structural Design Criteria for Electrostatic Precipitator Casings
ICAC F-3
Published Date: 01/01/2002
Operation and Maintenance of Fabric Collectors
ICAC WP-1
Published Date: 05/01/2009
White Paper: Selective Catalytic Reduction (SCR) Controls for NO x Emissions from Fossil Fuel-Fired Electric Power Plants