DNV DNVGL-RP-G107 PDF

DNV DNVGL-RP-G107 PDF

Name:
DNV DNVGL-RP-G107 PDF

Published Date:
09/01/2019

Status:
[ Revised ]

Description:

Efficient updating of risk assessments

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$43.5
Need Help?
W/D S/S BY DNV-RP-G107 * NO LONGER AVAILABLE

This RP focuses on recommendations for updating risk assessments during the operational phase of a facility by assessing the effect of changes in the risk assessment basis, using a combination of qualitative and quantitative methods to deliver the decision basis. A three-phase approach has been defined covering the following: screening, re-assessment and implementation.

The purpose of the screening phase is to identify changes to the operational conditions and design basis in order to establish if the effects of these changes are understood and/or critical. This is then used as input for deciding whether updates are necessary. The purpose of the re-assessment phase is to ensure that a sufficient basis for effective risk management is in place for follow-up in the implementation phase.

There are essentially three types of changes that can occur. Firstly, the operational or technical conditions may change, directly affecting the risk level. Secondly, new knowledge acquired may influence the assessment of the risk level. Thirdly, there could be changes to the context, e.g. new regulatory or stakeholder requirements, new risk treatment options etc., affecting the tolerability of risks. Different actions may be required, depending on the type of changes.


Edition : 19
File Size : 1 file , 750 KB
Number of Pages : 32
Published : 09/01/2019

History

DNV DNV-RP-G107
Published Date: 09/01/2019
Efficient updating of risk assessments
$43.5
DNV DNVGL-RP-G107
Published Date: 09/01/2019
Efficient updating of risk assessments
$43.5
DNV DNVGL-RP-G107
Published Date: 11/01/2016
Efficient updating of risk assessments
$43.5

Related products

DNV GL INDUSTRIAL SERVICES IV-7-3
Published Date: 10/01/2013
IV-Rules for Classification and Construction Industrial Services Part 7-Offshore Substations Chapter 3-General Safety
$17.1
DNV DNV-RU-SHIPS PART 5 CHAPTER 2
Published Date: 07/01/2016
NEW BUILDINGS SPECIAL SERVICE AND TYPE – ADDITIONAL CLASS Passenger and dry cargo ships
$17.1

Best-Selling Products

ASSE (Plumbing) 1001-2008
Published Date: 02/18/2008
Performance Requirements for Atmospheric Type Vacuum Breakers
$13.5
ASSE (Plumbing) 1001-2017
Published Date: 06/01/2017
Performance Requirements for Atmospheric Type Vacuum Breakers
$13.5
ASSE (Plumbing) 1001-2021
Published Date: 11/01/2021
Performance Requirements for Atmospheric Type Vacuum Breakers
$13.5
ASSE (Plumbing) 1002-2008
Published Date: 04/28/2008
Performance Requirements for Anti-Siphon Fill Valves for Water Closet Tanks
$13.5
ASSE (Plumbing) 1002-2020/ASME A112.1002-2020/CSA B125.12:20
Published Date: 04/01/2020
Anti-Siphon Fill Valves for Water Closet Tanks
$25.5
ASSE (Plumbing) 1003-2009
Published Date: 09/28/2009
Performance Requirements for Water Pressure Reducing Valves for Domestic Water Distribution Systems
$13.5