DNV DNVGL-RP-G107 PDF

DNV DNVGL-RP-G107 PDF

Name:
DNV DNVGL-RP-G107 PDF

Published Date:
11/01/2016

Status:
[ Revised ]

Description:

Efficient updating of risk assessments

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$43.5
Need Help?

This RP focuses on recommendations for updating risk assessments during the operational phase of a facility by assessing the effect of changes in the risk assessment basis, using a combination of qualitative and quantitative methods to deliver the decision basis. A three-phase approach has been defined covering the following: screening, re-assessment and implementation, see Figure 1-2.

The purpose of the screening phase is to identify changes to the operational conditions and design basis in order to establish if the effects of these changes are understood and/or critical. This is then used as input for deciding whether updates are necessary. The purpose of the re-assessment phase is to ensure that a sufficient basis for effective risk management is in place for follow-up in the implementation phase.

There are essentially three types of changes that can occur. Firstly, the operational or technical conditions may change, directly affecting the risk level. Secondly, new knowledge acquired may influence the assessment of the risk level. Thirdly, there could be changes to the context, e.g. new regulatory or stakeholder requirements, new risk treatment options etc., affecting the tolerability of risks. Different actions may be required, depending on the type of changes.


Edition : 16
File Size : 1 file , 730 KB
Number of Pages : 33
Published : 11/01/2016

History

DNV DNV-RP-G107
Published Date: 09/01/2019
Efficient updating of risk assessments
$43.5
DNV DNVGL-RP-G107
Published Date: 09/01/2019
Efficient updating of risk assessments
$43.5
DNV DNVGL-RP-G107
Published Date: 11/01/2016
Efficient updating of risk assessments
$43.5

Related products

DNV DNV CLASSIFICATION NOTES 61.1
Published Date: 02/01/2004
CARGO VAPOUR RECOVERY SYSTEMS
$17.1
DNV DNV-RU-SHIPS PART 3 CHAPTER 14
Published Date: 07/01/2024
Part 3 Hull - Chapter 14 Rudders and steering
$17.1
DNV DNV-OSS-302
Published Date: 10/01/2010
Offshore Riser Systems
$17.1
DNV DNV-OS-E201
Published Date: 07/01/2024
Oil and gas processing systems
$17.1

Best-Selling Products

ISO/R 1938-1:1971
Published Date: 01/01/1971
ISO system of limits and fits - Part 1: Inspection of plain workpieces
$30.6
ISO/R 1938:1971
Published Date: 02/01/1971
ISO system of limits and fits - Part II : Inspection of plain workpieces
$44.7
ISO/R 463:1965
Published Date: 12/01/1965
Dial gauges reading in 0.01 mm, 0.001 in and 0.0001 in
$9.9
ISO/R 538:1967
Published Date: 01/01/1967
Conventional signs to be used in the schemes for the installations of pipeline systems in ships
$36.9
ISO/R 644:1967
Published Date: 12/01/1967
Conventional signs to be used in schemes for the installations of ventilation systems in ships
$36.9
ISO/R 773:1969
Published Date: 01/01/1969
Rectangular or Square Parallel Keys and their Corresponding Keyways (Dimensions in Millimetres)
$19.5