DNV DNV-RU-SHIPS PART 7 CHAPTER 8 PDF

DNV DNV-RU-SHIPS PART 7 CHAPTER 8 PDF

Name:
DNV DNV-RU-SHIPS PART 7 CHAPTER 8 PDF

Published Date:
01/01/2003

Status:
[ Revised ]

Description:

SHIPS IN OPERATION - MACHINERY SURVEY ARRANGEMENTS

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$17.1
Need Help?

Machinery survey arrangements

The different machinery survey arrangements are based on the same inventory list established for the vessel. The difference is the conditions for obtaining and maintaining the survey arrangement. If a survey arrangement is not specified, Machinery Renewal is set as default.

The following survey arrangements are available:

Machinery Renewal, see B

Machinery Continuous, see C

Machinery PMS (Planned Maintenance System), see D

Machinery CM (Condition Monitoring), see E


Edition : 03
File Size : 1 file , 96 KB
Number of Pages : 11
Published : 01/01/2003

History

DNV DNV-RU-SHIPS PART 7 CHAPTER 8
Published Date: 01/01/2003
SHIPS IN OPERATION - MACHINERY SURVEY ARRANGEMENTS
$17.1
DNV DNV-RU-SHIPS PART 7 CHAPTER 8
Published Date: 01/01/2003
SHIPS IN OPERATION - MACHINERY SURVEY ARRANGEMENTS
$17.1
DNV DNV-RU-SHIPS PART 7 CHAPTER 8
Published Date: 01/01/2003
SHIPS IN OPERATION - MACHINERY SURVEY ARRANGEMENTS
$17.1
DNV DNV-RU-SHIPS PART 7 CHAPTER 8
Published Date: 07/01/2002
SHIPS IN OPERATION - MACHINERY SURVEY ARRANGEMENTS
$17.1

Related products

DNV DNV-CP-0348
Published Date: 09/01/2021
Rolled steel products specially designed for container ships properties
$17.1
DNV DNV-RU-SHIPS PART 5 CHAPTER 12
Published Date: 07/01/2022
Part 5 Ship types - Chapter 12 Fishing vessels
$17.1
DNV DNV-RU-HSLC PART 7 CHAPTER 2
Published Date: 01/01/2009
HSLC IN OPERATION - Retroactive Requirements
$17.1
DNV DNV-RU-SHIPS PART 3 CHAPTER 2
Published Date: 01/01/2015
NEWBUILDINGS HULL AND EQUIPMENT - MAIN CLASS - Hull structural design - Ships with length less than 100 metres
$17.1

Best-Selling Products

CAN/CSA-CEI/IEC 1000-1-1-97 (R2023)
Published Date: 01/18/2000
Electromagnetic Compatibility (EMC) - Part 1: General - Section 1: Application and Interpretation of Fundamental Definitions and Terms (Adopted CEI/IEC 1000-1-1:1992)
$37.8
CAN/CSA-CEI/IEC 1000-2-1-97 (R2023)
Published Date: 01/18/2000
Electromagnetic Compatibility (EMC) - Part 2: Environment - Section 1: Description of the Environment - Electromagnetic Environment for Low-Frequency Conducted Disturbances and Signalling in Public Power Supply Systems (Adopted CEI/IEC 1000- 2-1:1990) / Compatibilite electromagnetique (CEM) - Partie
$36.3
CAN/CSA-CEI/IEC 1160-96 (R2001)
Published Date: 05/03/2000
Formal Design Review (Adopted CEI/IEC 1160:1992) / Revue de conception formalisee (norme CEI/IEC 1160:1992 adoptee)
$31.5
CAN/CSA-CEI/IEC 1258-98 (R2002)
Published Date: 02/25/2000
Guidelines for the Development and Use of Medical Electrical Equipment Educational Materials (Adopted CEI/IEC 1258:1994, first edition) / Guide pour le developpement et l'utilisation des supports educatifs relatifs aux appareils electromedicaux (norme CEI/IEC 1258:1994 adoptee, premiere edition) **
CAN/CSA-CEI/IEC 1288-1-98 (R2012)
Published Date: 02/16/2000
Cardiac Defibrillators - Cardiac Defibrillators-Monitors - Part 1: Operation (Adopted CEI/IEC 1288-1:1993, first edition) / Defibrillateurs cardiaques - Moniteurs-defibrillateurs cardiaques - Partie 1: Fonctionnement (norme CEI/IEC 1288-1:1993 adoptee, premiere edition)
CAN/CSA-CEI/IEC 1288-2-98 (R2012)
Published Date: 02/16/2000
Cardiac Defibrillators - Cardiac Defibrillators-Monitors - Part 2: Maintenance (Adopted CEI/IEC 1288-2:1993, first edition) / Defibrillateurs cardiaques - Moniteurs-defibrillateurs cardiaques - Partie 2: Maintenance (norme CEI/IEC 1288-2:1993 adoptee, premiere edition)