DNV DNVGL-RP-F118 PDF

DNV DNVGL-RP-F118 PDF

Name:
DNV DNVGL-RP-F118 PDF

Published Date:
09/01/2019

Status:
[ Revised ]

Description:

Pipe girth weld automated ultrasonic testing system qualification and project specific procedure validation

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$43.5
Need Help?
W/D S/S BY DNV-RP-F118 * NO LONGER AVAILABLE

The Scope of this document is to provide a uniform guideline for the general qualification of automated ultrasonic testing (AUT) systems according to the requirements for qualification of such systems given in DNV GL standard DNVGL-ST-F101 App.ESubmarine pipeline systems. This qualification activity will document the specific AUT system performance in terms of inherent functionality related to non changeable hardware, software and calibration philosophy. Qualification activity following this guideline will also document the AUT system performance in terms of POD and sizing capabilities relevant for applications where the essential variables remain within the specified tolerance as given in DNVGL-ST-F101 App.E and [2.4] in this document. The intention with this general qualification is to provide a repeatable and auditable process for AUT system qualifications allowing project specific validations where the scope for the project specific validation can be designed to verify compliance with the general AUT system performance as documented in the general qualification. The extent of this validation will depend on the identified deviations from essential variables referenced in DNVGL-ST-F101 App.E and [2.4] in this document as well as any pre requisites referenced in the general qualification document. A recommended scope for a project specific validation is included in this RP.

This document describes in details the specific system requirements, input requirement, qualification process and data analyses process. The scope includes qualification of any AUT system to document reliability, repeatability and accuracy for detection and sizing of defects in pipeline girth welds. In principle, the recommended practice (RP) can be utilised for all materials but special care shall be taken for applications where inconsistent wave propagation or other wave physics are affected by structural properties such as anisotropic materials. In such applications, a specific assessment shall be made to determine the adequacy of the implementation of this RP.


Edition : 19
File Size : 1 file , 170 KB
Number of Pages : 26
Published : 09/01/2019

History

DNV DNV-RP-F118
Published Date: 09/01/2019
Pipe girth weld automated ultrasonic testing system qualification and project specific procedure validation
$43.5
DNV DNVGL-RP-F118
Published Date: 09/01/2019
Pipe girth weld automated ultrasonic testing system qualification and project specific procedure validation
$43.5
DNV DNVGL-RP-F118
Published Date: 05/01/2017
Pipe girth weld automated ultrasonic testing system qualification and project specific procedure validation
$43.5
DNV DNV-RP-F118
Published Date: 10/01/2010
PIPE GIRTH WELD AUT SYSTEM QUALIFICATION AND PROJECT SPECIFIC PROCEDURE VALIDATION
$43.5

Related products

DNV GL ADDITIONAL RULES AND GUIDELINES VI-3-11
Published Date: 03/01/2003
VI-Rules for Classification and Construction Additional Rules and Guidelines Part 3-Machinery Installations Chapter 11-Guidelines for the Use of Fuel Cell Systems on Board of Ships and Boats
$17.1
DNV DNV-RU-SHIPS PART 2 CHAPTER 3
Published Date: 07/01/2016
NEW BUILDING MATERIALS AND WELDING Fabrication and testing of ships
$17.1
DNV DNV-RU-YACHT PART 4 CHAPTER 9
Published Date: 08/01/2021
Part 4 Systems and components - Chapter 9 Control and monitoring systems
$17.1

Best-Selling Products