IPC D-640A PDF

IPC D-640A PDF

Name:
IPC D-640A PDF

Published Date:
04/01/2022

Status:
Active

Description:

Design and Critical Process Requirements for Optical Fiber, Optical Cable and Hybrid Wiring Harness Assemblies

Publisher:
Association Connecting Electronics Industries

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$54.6
Need Help?

This document provides design and critical process requirements and technical insight for cable and wire harness assemblies incorporating optical fiber, optical cable and hybrid wiring technology. Reference materials listed in this text are among those considered as required reading. The User is encouraged to obtain all relevant referenced materials, as this document cannot (nor can any single document) cover every material, process, environment, performance, or safety aspect, that impact a given design.


File Size : 1 file , 2.7 MB
ISBN(s) : 9781638160595
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 80
Product Code(s) : D640-STD-0-D-0-EN-A, D640-STD-0-D-0-EN-A
Published : 04/01/2022

History

IPC D-640A
Published Date: 04/01/2022
Design and Critical Process Requirements for Optical Fiber, Optical Cable and Hybrid Wiring Harness Assemblies
$54.6

Related products

IPC SG-141
Published Date: 02/01/1992
Specification for Finished Fabric Woven from "S" Glass for Printed Boards
$30.3
IPC 2252
Published Date: 06/01/2002
Design Guide for RF/Microwave Circuit Boards
$30.3
IPC 4563
Published Date: 11/01/2007
Resin Coated Copper Foil for Printed Boards Guideline
$30.3
IPC 4761
Published Date: 07/01/2006
Design Guide for Protection of Printed Board Via Structures
$54.6

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138