NG AMBP 051 PDF

NG AMBP 051 PDF

Name:
NG AMBP 051 PDF

Published Date:
08/01/2015

Status:
[ Active ]

Description:

Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$138
Need Help?

PURPOSE AND SCOPE

This procedure defines how National Grid, Asset Management, Maintenance Delivery Electricity (MDE) will both implement the CDM Regulations 2007 and integrate their requirements into the business processes.

The principles of CDM, applies to all construction work and includes: alterations, fitting out, renovation, commissioning, repair, upkeep and substantial dismantling.

Projects/construction works are notifiable to the HSE if:-

• The on site project construction work lasts for more than 30 working days.

• The on site project construction phase employs 500 person days of work or more.

General maintenance of fixed plant is not classed as construction work except when this is done as part of other construction work, or it involves substantial dismantling or alteration of fixed plant which is large enough to be a structure in its own right.

This procedure applies to all MDE project managed construction work (e.g. NRR/CAPEX Schemes). In all cases where Construction are the project managers TP137 shall be used. This procedure does not apply to work carried out under Management of Maintenance Policy NSPM 203.

The key aim of the 2007 Regulations (which is required to be reflected in National Grid’s ways of working) is to integrate health and safety into the management of the project to encourage everyone to work together. The full suite of procedural documentation and the roles to which they apply are highlighted in APPENDIX A. Compliance with these will ensure to:

• Improve the planning and management of projects from the very start.

• Identify hazards early on so they can be eliminated or reduced at the design or planning stage ensuring any remaining risks can be properly managed. • Target effort where it is most beneficial in terms of health and safety.

• Discourage unnecessary bureaucracy.

• Ensure effort is proportional to the risks and ensure that paperwork does not get in the way of the real business of risk reduction and management.

The ‘Pre-Construction Information Pack’ and ‘Construction Phase Plan’ also incorporate environmental legislation and security requirements, i.e. SHES. This is over and above the requirement of the 2015 CDM Regulations. These documents are therefore titled the Pre-Construction SHES information Pack (APPENDIX C) and the Construction Phase SHES Plan (APPENDIX D).

This procedure also defines how National Grid, Asset Management will implement the Management of TemporaryWorks (TW).

 


Edition : 4
File Size : 1 file , 1.8 MB
Number of Pages : 129
Published : 08/01/2015

History

NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138

Related products

NG SCT 01
Published Date: 01/01/2013
Site Commissioning Tests - Requirements for Site Commissioning Tests - On Protection & Control Equipment
$55.2
NG UKBP/TP 181
Published Date: 07/01/2013
UK Business Procedure/Transmission Procedures - Continuous Improvement Within The Investment Process
$55.2
NG TGN(T) 041
Published Date: 01/01/1993
Technical Guidance Notes - General Requirements for the Installation of Externally Attached Optical Cable to Overhead Line Earthwires
$55.2
NG TS 3.04.09
Published Date: 02/01/2010
Technical Specifications - Safety Signs and Information Plates for Overhead Lines
$55.2

Best-Selling Products

MODUK ANNEX B TO DEFFORM 47
Published Date: 09/01/2021
DEFFORM 47 – Annex B
MODUK ANNEX D TO GFI 20
Published Date: 01/01/2003
Annex D to GFI 20 - The 2003 General Review of the Profit Formula For Non-Competitive Government Contracts
$0.3
MODUK AQAP-2000
Published Date: 09/01/2007
NATO POLICY ON AN INTEGRATED SYSTEMS APPROACH TO QUALITY THROUGH THE LIFE CYCLE
MODUK AQAP-2000
Published Date: 12/03/2009
NATO POLICY ON AN INTEGRATED SYSTEMS APPROACH TO QUALITY THROUGH THE LIFE CYCLE
$2.4
MODUK AQAP-2009
Published Date: 03/01/2010
NATO GUIDANCE ON THE USE OF THE AQAP 2000 SERIES
$5.1
MODUK AQAP-2009
Published Date: 11/01/2006
NATO GUIDANCE ON THE USE OF THE AQAP 2000 SERIES