NG CH 09 PDF

NG CH 09 PDF

Name:
NG CH 09 PDF

Published Date:
02/01/2002

Status:
[ Active ]

Description:

Commissioning Handbook - Primary Injection of Current Transformers for Feeder Protection

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$55.2
Need Help?

PURPOSE

 The purpose of this procedure is to provide a model process for primary injection testing of feeder protection. The tests are intended to establish the integrity of the associated current transformers and their secondary connections. These tests are required to prove:

  • The CTs have not been damaged during transport or erection.
  • The ratio of each CT, or that a CT ratio change has been correctly carried out.
  • The relative polarity of the three phase group of CTs.
  • The secondary connections from the CT, up to and including the relay.

In some instances it may only be possible to carry out this test from the CT to a defined terminal connection point, with the connections from this point onward to the relay, including an overlap, being proved by secondary injection.


Edition : 3
File Size : 1 file , 53 KB
Number of Pages : 9
Published : 02/01/2002

History


Related products

NG UKBP/TP 183
Published Date: 05/01/2018
UK Business Procedure/Transmission Procedure - Type Registered Equipment Procedural Requirements
$144.9
NG UKBP/TP 221
Published Date: 02/01/2019
UK Business Procedure/Transmission Procedures - Technical Data Processing and Assurance
$55.2
NG NGUK/CD/BP 213E
Published Date: 10/01/2014
UK Capital Delivery Business Procedures - Avoidance of Buried Services
$55.2
NG TS 3.07.02
Published Date: 03/01/1995
Technical Specifications (NGTS) - Controls
$55.2

Best-Selling Products

NS-CEN ISO/TS 15011-6:2012/AC:2012
Published Date: 07/15/2012
Health and safety in welding and allied processes - Laboratory method for sampling fume and gases - Part 6: Procedure for quantitative determination of fume and gases from resistance spot welding - Technical Corrigendum 1 (ISO/TS 15011-6:2012/Cor 1:2012)
Free Download