Purpose and scope

This document will define in general terms the principal activities associated with design assurance, focussing on the specific tasks to be undertaken. The document is provided for guidance only and should be viewed as an "aide memoire" to the practising assurance engineer. It is not exhaustive or intended to replace existing documentation.

The guide will follow the TP146 process stages with emphasis placed on the adoption of a risk based strategy concentrating on key issues or on areas of design that have traditionally caused problems for scheme delivery. Throughout all project stages the assurance engineer is expected to actively engage with the delivery organisations design team to ensure that;

  • a mutually agreeable design is tabled at each project stage
  • the extent and detail of documentation and drawings meets the requirements of the project stage
  • an acceptable design delivery programme is agreed allowing sufficient time for review, agreement and amendment as required

The document is sectionalised for each engineering discipline and for each project stage. A confirm/check approach, against a particular subject area, has been adopted for ease of reading and application


Edition : 1
Number of Pages : 41
Published : 04/01/2011

History

NG DH 24
Published Date: 04/04/2014
Design Handbook - Guidance for Engineering Assurance Engineers
$55.2
NG DH 24
Published Date: 04/01/2011
Design Handbook - Guidance for Design Assurance Engineers

Related products

NG SCT 37.04
Published Date: 05/01/2000
Site Commissioning Tests - ABB HSD50 PLC Intertripping and Protection Signalling Equipment
$55.2
NG CH 19
Published Date: 01/01/2003
Commissioning Handbook - Primary and Secondary Injection of Double Wound Transformers and their Main Protections
$55.2
NG DH 08
Published Date: 04/01/2014
Design Handbook - Guidance On The Preparation of Settings for Non-Unit (Distance Protection for 400 & 275kv Feeders
$55.2
NG TS 3.04.31
Published Date: 06/01/2013
Technical Specifications - Specification for Steelwork Inspection and Condition Assessment of Overhead Line Towers
$138

Best-Selling Products