NG TS 2.01 PDF

NG TS 2.01 PDF

Name:
NG TS 2.01 PDF

Published Date:
06/01/2007

Status:
[ Revised ]

Description:

Technical Specifications - Substations

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$193.2
Need Help?

This Specification covers all National Grid substations with equipment installed for use on 66, 132, 275 and 400kV, 50 Hz systems. Substations operating at other voltages are expected to comply with the general provisions of this specification. It is applicable to both open-terminal air-insulated (AIS) and metal-enclosed gas-insulated (GIS) substation constructions (including hybrids thereof) and covers equipment operated at lower voltages on the same substation site. It is applicable to new construction and extensions to existing installations.

Where a 'CEGB Standard' substation is to be extended the project specification may also refer to obsolete Transmission Plant Specifications which are available from National Grid.

All National Grid plant and apparatus wholly within the substation and not covered more specifically by other National Grid Technical Specifications (TS) is within the scope of this document.

This document follows closely the format and content of IEC 61936-1, Power installations exceeding 1kVcommon rules, and should be read in conjunction with BS 7354, Design of high-voltage open terminal stations. Regarding the hierarchy of requirements given in these documents, specific requirements detailed in National Grid Technical Specifications shall take precedence over guidance of BS 7354 which in turn shall take precedence over the general provisions of IEC 61936-1.


Edition : 5
File Size : 1 file , 850 KB
Number of Pages : 59
Published : 06/01/2007

History

NG TS 2.01
Published Date: 06/01/2007
Technical Specifications - Substations
$241.5
NG TS 2.01
Published Date: 06/01/2007
Technical Specifications - Substations
$193.2

Related products

NG SCT 16.04
Published Date: 12/01/2004
Site Commissioning Tests - Operator Commissioning of 3-Phase 4-Wire Settlement Metering
$55.2
NG TS 3.08.09
Published Date: 03/01/2010
Technical Specifications - Overhead Line Earthwire Incorporating Optical Cable (Opgw)
$55.2
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG UKBP/TP 215
Published Date: 07/01/2016
UK Business Procedure/Transmission Procedures - Electricity Investment Process – Environmental compliance and Sustainability
$138

Best-Selling Products