NG TS 3.09.13 PDF

NG TS 3.09.13 PDF

Name:
NG TS 3.09.13 PDF

Published Date:
03/01/2010

Status:
[ Active ]

Description:

Technical Specifications - Settlement Metering At The Distibtution Interface

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$138
Need Help?

PURPOSE AND SCOPE

This specification defines the requirements for Balancing and Settlement Code (BSC) Settlement Metering installed at the Distribution interface at National Grid Company plc owned substations.

The specification may be used in other situations requiring Code of Practice (COP 1 and COP2) compliant metering systems, such as for power station applications, but no responsibility can be taken or inferred for the suitability in such cases. Advice should be sought in such instances from National Grid Asset Policy.

This specification describes the overall requirements for Settlement Metering (SM) and specifically defines the functional and performance requirements for the light current aspects of the required equipment.

SM is also required to provide Operational Metering Data (OMD) in the form of active and reactive power values.

The energy meters covered by this specification may also be used to provide Quality of Supply (QoS) monitoring facilities in certain cases.


Edition : 1
File Size : 1 file , 100 KB
Number of Pages : 19
Published : 03/01/2010

History


Related products

NG TS 3.08.10
Published Date: 09/01/1992
National Grid Technical Specifications - Personal Radio - UHF
$59.1
NG SCT 16.07
Published Date: 03/01/2000
Site Commissioning Tests - Commissioning Schedule for Ancillary Services Generator Response Monitor Unit
$55.2
NG TS 3.07.22
Published Date: 04/01/1998
Technical Specifications (NGTS) - Diagnostic Facilities
$55.2
NG TS 3.04.25
Published Date: 01/01/2015
Technical Specifications - Aircraft and Navigational Warning Lights
$55.2

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138