NG UKBP/TP 135 PDF

NG UKBP/TP 135 PDF

Name:
NG UKBP/TP 135 PDF

Published Date:
10/01/2015

Status:
[ Revised ]

Description:

UK Business Procedure/Transmission Procedures - Management of Drawings (Electricity Assets)

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$138
Need Help?

This business procedure specifies the requirements for the management of drawings associated with National Grid UK electricity transmission assets.

Where work impacts on master drawings owned by a third party, it is also necessary to fully comply with the drawing management processes specified by the asset owner concerned.

As the owner and operator of electricity transmission assets, National Grid has specific duties and statutory obligations with respect to the provision, design, construction, operation, and maintenance of its transmission plant and systems. In order to satisfy these obligations, and as a safe, prudent, efficient and competent operator, National Grid’s policy is to produce and maintain appropriate drawing records for its transmission assets. It is therefore a mandatory requirement that the requirements of this procedure are fully complied with by any party that undertakes work, which also impacts on asset drawings, whether such assets are new, or already in existence.

The following items are within the scope of this document; electronic master drawings, site held prints of drawings, site management of Construction Drawings, and Operation & Maintenance manuals.


Edition : 7
File Size : 1 file , 810 KB
Number of Pages : 54
Published : 10/01/2015

History

NG UKBP/TP 135
Published Date: 09/01/2018
UK Business Procedure/Transmission Procedures - Management of Electricity Transmission Asset Drawings
$144.9
NG UKBP/TP 135
Published Date: 10/01/2015
UK Business Procedure/Transmission Procedures - Management of Drawings (Electricity Assets)
$138
NG UKBP/TP 135
Published Date: 03/01/2014
UK Business Procedure/Transmission Procedures - Management of Drawings (Electricity Assets)
$138
NG UKBP/TP 135A
Published Date: 05/01/2007
UK Business Procedure/Transmission Procedures - Management of Drawings (Electricity Assets)
$55.2

Related products

NG CH 06
Published Date: 10/01/2013
Commissioning Handbook - Current Transformers
$55.2
NG TS 3.05.11
Published Date: 07/01/1999
National Grid Technical Specifications - Submarine Cable for A.C. System Voltages up to 150 kV
$55.2
NG CH 21
Published Date: 08/01/2014
Commissioning Handbook - Management of Numerical Protection Schemes
$55.2
NG SCT 20.04.02
Published Date: 02/01/2000
Site Commissioning Tests - Lead and CT Resistance Diagram
$55.2

Best-Selling Products

SAE/AIR 1064C
Published Date: 01/01/1997
Brake Dynamics
$20.7
SAE/AIR 1083B
Published Date: 06/01/1994
Airborne Hydraulic & Control System Survivability for Military Aircraft
$20.7
SAE/AIR 1093
Published Date: 12/01/1969
Numeral, Letter & Symbol Dimension/Aircraft Instrumentation
$20.7
SAE/AIR 1102A
Published Date: 05/01/1975
Transparent Area Washing Systems for Aircraft
$20.7
SAE/AIR 1168/6
Published Date: 07/01/1994
Characteristics of Equipment Components, Equipment Cooling System Design, and Temperature Control System Design
$22.8
SAE/AIR 1174A
Published Date: 04/01/1987
Index of Starting System Specifications and Standards
$20.7