NG UKBP/TP 135 PDF

NG UKBP/TP 135 PDF

Name:
NG UKBP/TP 135 PDF

Published Date:
09/01/2018

Status:
[ Active ]

Description:

UK Business Procedure/Transmission Procedures - Management of Electricity Transmission Asset Drawings

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$144.9
Need Help?

PURPOSE AND SCOPE

This business procedure specifies the requirements for the management of drawings associated with National Grid UK electricity transmission assets.

Where work impacts on master drawings owned by a third party, it is also necessary to fully comply with the drawing management processes specified by the asset owner concerned.

As the owner and operator of electricity transmission assets, National Grid has specific duties and statutory obligations with respect to the provision, design, construction, operation, and maintenance of its transmission plant and systems. In order to satisfy these obligations, and as a safe, prudent, efficient and competent operator, National Grid’s policy is to produce and maintain appropriate drawing records for its transmission assets. It is therefore a mandatory requirement that the requirements of this procedure are fully complied with by any party that undertakes work, which also impacts on asset drawings, whether such assets are new, or already in existence.

The following items are within the scope of this document; electronic master drawings, site held prints of drawings and site management of Construction Drawings, and Operation & Maintenance manuals. Areas out of the Purpose and Scope can be detailed in Section 2 of this document.


Edition : 9
File Size : 1 file , 1.5 MB
Number of Pages : 45
Published : 09/01/2018

History

NG UKBP/TP 135
Published Date: 09/01/2018
UK Business Procedure/Transmission Procedures - Management of Electricity Transmission Asset Drawings
$144.9
NG UKBP/TP 135
Published Date: 10/01/2015
UK Business Procedure/Transmission Procedures - Management of Drawings (Electricity Assets)
$138
NG UKBP/TP 135
Published Date: 03/01/2014
UK Business Procedure/Transmission Procedures - Management of Drawings (Electricity Assets)
$138
NG UKBP/TP 135A
Published Date: 05/01/2007
UK Business Procedure/Transmission Procedures - Management of Drawings (Electricity Assets)
$55.2

Related products

NG PS(T) 018
Published Date: 05/01/2010
Policy Statements - Prevention of Unauthorised Access to Steel Lattice Overhead Line Supports
$55.2
NG SCT 32.02
Published Date: 07/01/1998
Site Commissioning Tests - Remote Substation Controller
$55.2
NG TGN(E) 199
Published Date: 12/01/2004
Technical Guidance Notes - Management of Rise of Earth Potential at New and Refurbished Towers
$138
NG TS 3.24.57
Published Date: 11/01/2000
National Grid Technical Specifications - Standalone Quadrature Booster Control Systems
$55.2

Best-Selling Products

DID DI-ADMN-80222
Published Date: 08/05/1986
CLASSIFIED PROCESSING EQUIPMENT INVENTORY
$3.6
DID DI-ADMN-80239
Published Date: 09/15/1986
INFORMATION SYSTEMS ACCREDITATION DOCUMENTATION (SUPERSEDING DI-S-1831)
$3.6
DID DI-ADMN-80426
Published Date: 08/28/1987
COMPETITIVE SUBCONTRACTS REPORT (CSR)
$3.6
DID DI-ADMN-80447
Published Date: 09/28/1987
CONTRACT SUMMARY REPORT (SUPERSEDING DI-A-5030B)
$3.6
DID DI-ADMN-80447A
Published Date: 11/08/2006
CONTRACT SUMMARY REPORT (SUPERSEDING DI-ADMN-80447)
$3.6
DID DI-ADMN-80925
Published Date: 01/05/1990
REVISIONS TO EXSISTING GOVERNMENT DOCUMENTS
$7.2