Name:
NG UKBP/TP 135 PDF
Published Date:
03/01/2014
Status:
[ Revised ]
Publisher:
National Grid
PURPOSE AND SCOPE
This business procedure specifies the requirements for the management of drawings associated with National Grid UK electricity transmission assets.
Where work impacts on master drawings owned by a third party, it is also necessary to fully comply with the drawing management processes specified by the asset owner concerned.
As the owner and operator of electricity transmission assets, National Grid has specific duties and statutory obligations with respect to the provision, design, construction, operation, and maintenance of its transmission plant and systems. In order to satisfy these obligations, and as a safe, prudent, efficient and competent operator, National Grid’s policy is to produce and maintain appropriate drawing records for its transmission assets. It is therefore a mandatory requirement that the requirements of this procedure are fully complied with by any party that undertakes work, which also impacts on asset drawings, whether such assets are new, or already in existence.
| Edition : | 6 |
| File Size : | 1 file , 530 KB |
| Number of Pages : | 54 |
| Published : | 03/01/2014 |