NG UKBP/TP 141A PDF

NG UKBP/TP 141A PDF

Name:
NG UKBP/TP 141A PDF

Published Date:
03/01/2009

Status:
[ Revised ]

Description:

UK Business Procedure/Transmission Procedures - Authorisation Process for Commissioning, Settings and Design Engineers

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$55.2
Need Help?

PURPOSE AND SCOPE

This procedure defines the authorisation requirements for National Grid and Alliance personnel working on the delivery of National Grid’s Electricity Capital Plan when undertaking the following roles:-

Commissioning Authorisations

.Commissioning Panel Chairman

.Commissioning Officer

.Commissioning Engineer (National Grid) & (Alliance)

Settings Engineers Authorisations

.Settings Engineer (National Grid) & (Alliance)

Design Engineers Authorisations

.Protection & Control Design Assurance Engineer (National Grid)

.Protection & Control Design Verification Engineer (Alliance)

.Substation HV Design Assurance Engineer (National Grid)

.Substation HV Design Verification Engineer (Alliance)

.Overhead Line Design Assurance Engineer (National Grid)

.Overhead Line Design Verification Engineer (Alliance)

.HV Cable Design Assurance Engineer (National Grid)

.HV Cable Design Verification Engineer (Alliance)

.Substation Civil Design Assurance Engineer (National Grid)

.Substation Civil Design Verification Engineer (Alliance)

Personnel must be authorised in these roles to comply with the requirement of TP106A for Commissioning roles, TP107A for Settings Engineer’s roles and TP188A for Design Engineer’s roles.

Some of the formal roles which do not require separate authorisation are also defined in this procedure.

 


Edition : 2
File Size : 1 file , 170 KB
Number of Pages : 24
Published : 03/01/2009

History

NG UKBP/TP 141
Published Date: 04/01/2015
UK Business Procedure/Transmission Procedures - Authorisation Process for Commissioning, Settings and Design assurance Roles and Assessment Process for Contractor Design Approval Roles and Principal Designer Role
$275.7
NG UKBP/TP 141A
Published Date: 03/01/2009
UK Business Procedure/Transmission Procedures - Authorisation Process for Commissioning, Settings and Design Engineers
$55.2

Related products

NG TS 2.11
Published Date: 05/01/2012
Technical Specifications - Static Var Compensators for Connection To 275 Kv and 400kv Systems
$55.2
NG PS(T) 119
Published Date: 05/01/2016
Policy Statements - Application and Migration of Communication Protocol From GI74 to IEC60870-5-100 Between Substation Control Systems (SCS) and The Integrated Energy Management Systems (IEMS)
$59.1
NG TS 3.06.08
Published Date: 03/01/1999
National Grid Technical Specifications - Circuit Breaker Fail Protection
$55.2
NG TS 3.04.25
Published Date: 01/01/2015
Technical Specifications - Aircraft and Navigational Warning Lights
$55.2

Best-Selling Products