Name:
NG UKBP/TP 162A PDF
Published Date:
06/01/2007
Status:
[ Revised ]
Publisher:
National Grid
PURPOSE AND SCOPE
This document provides details for the preparation of contingency plans to be implemented in the event of a failure or unplanned outage of a complete numerical busbar protection system fitted at a 400 or 275kV double busbar substation.
| Edition : | 1 |
| File Size : | 1 file , 70 KB |
| Number of Pages : | 11 |
| Published : | 06/01/2007 |