NG UKBP/TP 163A PDF

NG UKBP/TP 163A PDF

Name:
NG UKBP/TP 163A PDF

Published Date:
05/01/2011

Status:
[ Revised ]

Description:

UK Business Procedure/Transmission Procedures - Site Installation

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$55.2
Need Help?

PURPOSE AND SCOPE

This document specifies National Grid procedural requirements and guidance for the site installation phase of a capital project undertaken by an Electricity Alliance. The diagram immediately following this text summarises the scope of this procedure. The purpose of the procedure is to ensure the following.

a) That National Grid discharges its legal obligations with reference to safety, health, environmental and security (SHES) requirements – with a particular focus upon the objective of 'safety by design' – see UKBP/TP189.

b) That site installation accords with National Grid's Technical Specifications and project specific requirements.

c) That site installation is appropriately planned and integrated into National Grid's business process and the work of other National Grid management units, such as Maintenance Delivery Electrical (MDE) and Electricity National Control Centre (ENCC).

d) That both to satisfy CDM 2007, and to maximise power system reliability, those with site installation duties are confirmed as possessing the requisite levels of competency.

e) That site installation is carried out with a demonstrable level of governance – resulting in an effective audit trail.

This procedure shall apply to all schemes and associated site works which comprise the National Grid Electricity Transmission capital programme as defined in UKBP/TP146 Investment Process.

If by exception the Project Team considers that the scope of their work is outside that required of a main stream investment then they may apply to the Technical Assurance Manager (TAM) in writing with supporting information to seek agreement to deviate from this procedure. Any such agreement will be recorded in writing detailing the nature of the deviation for audit purposes.


Edition : 2
File Size : 1 file , 570 KB
Number of Pages : 103
Published : 05/01/2011

History

NG UKBP/TP 163
Published Date: 10/01/2015
UK Business Procedure/Transmission Procedures - Site Installation
$275.7
NG UKBP/TP 163
Published Date: 06/01/2015
UK Business Procedure/Transmission Procedures - Site Installation
$275.7
NG UKBP/TP 163A
Published Date: 05/01/2011
UK Business Procedure/Transmission Procedures - Site Installation
$55.2

Related products

NG TS 3.24.97
Published Date: 06/01/2013
Technical Specifications - System for Lock-Out of Delayed Automatic Reclosure for Feeder Circuits With Sections of Cable Or Gib/Gil
$275.7
NG SCT 37.03
Published Date: 04/01/2001
Site Commissioning Tests - ABB NSD70C and NSD70D Signalling Equipment
$55.2
NG UKBP/TP 162
Published Date: 12/01/2018
UK Business Procedure/Transmission Procedures - Contingency Plans in Case of Failure of Numerical Busbar Protections
$138
NG TS 2.20
Published Date: 09/01/2014
Technical Specifications - Oil Containment At Electricity Substations and Other Operational Sites
$55.2

Best-Selling Products

NS 1:1944
Published Date: 10/01/1944
Kondensatorforskruning for 19 mm (3/4") utvendig diameter rør
NS 1000:1960
Published Date: 11/01/1960
Modular coordination in building industry — Basic principles
NS 10000:1971
Published Date: 02/01/1971
Designation and numbering system for metallic materials
NS 10001:1987
Published Date: 02/01/1987
Metallic materials — Terminology
NS 10005:1988
Published Date: 05/01/1988
Steel and steel products — Selection and preparation of samples and test pieces for mechanical tests
NS 10006:1988
Published Date: 05/01/1988
Steel and steel products — Selection and preparation of samples intended for the determination of the chemical composition