NG UKBP/TP 189 PDF

NG UKBP/TP 189 PDF

Name:
NG UKBP/TP 189 PDF

Published Date:
06/01/2010

Status:
[ Active ]

Description:

UK Business Procedure/Transmission Procedures - The Elimination and Recuction of Shes Risks and Hazards During Scheme Design, Installation and Commissioning (Safety by Design)

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
ng-ukbp-tp-189_2845310

Choose Document Language:
55.20 €
Need Help?

PURPOSE AND SCOPE

Whereas UKBP/TP137, the parent document, defines how National Grid implements the requirements of CDM 2007, this document defines the strategy for achieving a prime objective of CDM 2007, that is, a 'safety by design' work environment.

This procedure applies to all projects which comprise the Transmission Construction Electricity Capital Programme, including associated revenue projects. The requirements of this procedure must therefore be understood and enacted by all those with defined responsibilities within the procedure.


Edition : 1
File Size : 1 file , 96 KB
Number of Pages : 21
Published : 06/01/2010

History


Related products

NG TS 2.26
Published Date: 12/01/2010
Technical Specifications - 132 kV Mechanically Switched Capacitor Banks and Damping Networks
55.20 €
NG TGN(E) 066
Published Date: 09/01/2000
Technical Guidance Notes - Thermal Overload Capabilities of Protection Equipment
138.00 €
NG TS 3.04.16
Published Date: 09/01/2014
Technical Specifications - Fabrication and Erection of Lattice Tower Steelwork
138.00 €
NG UKBP/TP 234
Published Date: 07/01/2015
UK Business Procedure/Transmission Procedures - Management of Impressied Voltages and Methods of Control
55.20 €

Best-Selling Products