NR NB 204/INDEX ISSUE 3 PDF

NR NB 204/INDEX ISSUE 3 PDF

Name:
NR NB 204/INDEX ISSUE 3 PDF

Published Date:
08/23/2021

Status:
[ Active ]

Description:

Updates to Requirements for Provision of Controls and Information for Signallers to Enable Safe and Effective Monitoring and Control of the Railway

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

This notice board and its appendices apply to the specification, detailed design, acceptance and testing of signaller`s control systems (including static symbols, indications and alarms) for

 

  • VDU-based signalling control system (VSCS) workstations;

  • route setting panels;

  • signal boxes with lever frames, non route setting panels or block shelf switches.

Section 5 contains an index of the individually published appendices.

Each appendix covers a separate topic area, although some topics may be covered by more than one appendix

 

 

 

 


Edition : 3
File Size : 1 file , 3.5 MB
Number of Pages : 3
Published : 08/23/2021

History

NR NB 204/INDEX ISSUE 3
Published Date: 08/23/2021
Updates to Requirements for Provision of Controls and Information for Signallers to Enable Safe and Effective Monitoring and Control of the Railway
$5.7
NR NB 204/INDEX ISSUE 2
Published Date: 07/27/2021
Updates to Requirements for Provision of Controls and Information for Signallers to Enable Safe and Effective Monitoring and Control of the Railway
$5.7
NR NB 204/INDEX ISSUE 1
Published Date: 07/23/2021
Updates to Requirements for Provision of Controls and Information for Signallers to Enable Safe and Effective Monitoring and Control of the Railway
$5.7

Related products

NR X80080 ISSUE 2
Published Date: 06/07/2003
MCB-CCTV Typical Circuits Barrier Control Circuits (1) for Level Crossings located at a Conventional Signal Interlocking
$5.7
NR BRS-SM 2551
Published Date: 01/30/1995
Mechanical Backdrive Mounted in 4' on R.H.S. Full Depth CV Layout Point Machine Mounted on L.H.S.
$5.7
NR TWI 2S059 ISSUE 1
Published Date: 03/01/2005
How to Inspect Switch Heaters
$5.7
NR NR/L2/OHS/00130/03 ISSUE 2
Published Date: 06/03/2023
Creating a Site of Work Segregated from the Railway: Within a Possession
$13.2

Best-Selling Products

ICAO 10000
Published Date: 2014
Manual on Flight Data Analysis Programmes (FDAP)
ICAO 10000
Published Date: 01/01/2014
Manual on Flight Data Analysis Programmes (FDAP)
ICAO 10000
Published Date: 01/01/2021
Manual on Flight Data Analysis Programmes (FDAP)
ICAO 10000
Published Date: 01/01/2021
Руководство по программам анализа полетных данных (ПАПД)
ICAO 10000
Published Date: 01/01/2021
Manuel sur les programmes d’analyse des données de vol (FDAP)
ICAO 10000
Published Date: 01/01/2014
Manual on Flight Data Analysis Programmes (FDAP)