NR NR/BS/LI/152 ISSUE 1 PDF

NR NR/BS/LI/152 ISSUE 1 PDF

Name:
NR NR/BS/LI/152 ISSUE 1 PDF

Published Date:
11/09/2009

Status:
[ Withdrawn ]

Description:

Letter of Instruction: Electrical Tripping - Midland Mainline Headspan Area

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
W/D * PDF ONLY

This instruction is applicable to the section of line between Graeme Park and Bedford where the principal means of OLE support is via Headspan arrangement.

It is an enhancement to GE/RT8000 – Module AC and does not change any requirements for compliance with legislation, other standards or Health and Safety.


Edition : 1
File Size : 1 file , 260 KB
Number of Pages : 6
Published : 11/09/2009

History


Related products

NR NR/L3/SCO/311/19 ISSUE 2
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Driving and Operational Requirements
$7.5
NR BR 1681 ISSUE F
Published Date: 10/01/1990
CCTV Camera with Charge Coupled Device (CCD), Solid State Sensor, for Level Crossing Surveillance
$13.2
NR NR/GN/SIG/19054 ISSUE 3
Published Date: 06/04/2022
SSI Technicians' Manual
$7.5
NR NR/L2/SIG/19820/K02 ISSUE 1
Published Date: 03/05/2022
Signalling and Level Crossing Product Specifications: Equipment Enclosures
$13.2

Best-Selling Products

Colour Physics for Industry
Published Date: 01/01/1996
$28.5