NR NR/L3/SCO/311/19 ISSUE 2 PDF

NR NR/L3/SCO/311/19 ISSUE 2 PDF

Name:
NR NR/L3/SCO/311/19 ISSUE 2 PDF

Published Date:
03/05/2022

Status:
[ Active ]

Description:

Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Driving and Operational Requirements

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module is applicable to the Supply Chain Operations managed fleet where Network Rail is identified as the Entity in Charge of Maintenance (ECM) on the National Vehicle Register (NVR).

This module is applicable to all SCO teams responsible for the engineering and management of SCO T&RS and OTM assets.

SCO owned assets which have a third party ECM identified in the NVR are not in scope of this module.

On-Track Plant (OTP), Mobile Depot Plant (MDP) and Fixed Depot Plant (FDP) are not in scope of this module. 

Purpose

This module provides requirements and procedures to enable Supply Chain Operations (SCO) to comply with Railways and Other Guided Transport Systems (ROGS), with the requirements of NR/L1/RMVP/0001 and NR/L2/RMVP/0090 (where specified) and enables the implementation of an ISO 55001 compliant Asset Management System (AMS) within SCO.

This module provides requirements for the technical input into the driving and operation of SCO fleets and defines driving and operational requirements to establish an ISO55001 AMS within SCO for T&RS and OTM assets.

The application of the requirements and procedures contained within this module mitigate the following high-level risks:

a) Non-compliance with legislation and regulatory requirements.

b) Maintenance safety risks posed to staff undertaking maintenance on Network Rail On Track Machines (OTM) and Traction and Rolling Stock (T&RS) assets

c) Driving and operational safety risks posed by Network Rail OTM and T&RS assets when operated on Network Rail managed infrastructure.


Edition : 2
File Size : 1 file , 180 KB
Number of Pages : 6
Published : 03/05/2022

History

NR NR/L3/SCO/311/19 ISSUE 2
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Driving and Operational Requirements
$7.5
NR NR/L3/SCO/311/19 ISSUE 1
Published Date: 06/02/2018
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Operational Requirements for SCO Fleet
$7.5

Related products

NR NR/L2/SIG/30014/G130/A&R03 ISSUE 1
Published Date: 09/03/2011
Temporary Single Railing of 50Hz AC Double Rail Track Circuits
$5.7
NR NR/L3/INV/3001/RIM206 ISSUE 1
Published Date: 12/03/2011
Reporting & Investigation Manual: Investigations Led by Other Railway Group Members
$7.5
NR NR/L2/INI/P3M/106 ISSUE 1
Published Date: 12/07/2019
Risk Management for Project, Programme and Portfolio Delivery
$18.6
NR NB 204/INDEX ISSUE 3
Published Date: 08/23/2021
Updates to Requirements for Provision of Controls and Information for Signallers to Enable Safe and Effective Monitoring and Control of the Railway
$5.7

Best-Selling Products

REA B50-1
Published Date: 10/04/1988
REA Standard T-805B, Electric Transmission Specifications and Drawings, 115 kv through 230 kV
$17.1