NR NR/CIV/SD/552 ISSUE E PDF

NR NR/CIV/SD/552 ISSUE E PDF

Name:
NR NR/CIV/SD/552 ISSUE E PDF

Published Date:
09/02/2017

Status:
[ Active ]

Description:

Tunnels - Sprayed Concrete Lining Renewal: Upper Haunch Breakout & Replacement

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY


Edition : E
File Size : 1 file , 1.8 MB
Number of Pages : 2
Published : 09/02/2017

History


Related products

NR NR/L3/ELP/3091 ISSUE 6
Published Date: 09/07/2024
DC Conductor Rail Electrified Lines Working Instructions
$18.6
NR RT/E/C/19048 ISSUE 1
Published Date: 04/01/2003
Signalling Equipment Technical Advice Notice (SIGTAN 48) - Train Protection & Warning System (TPWS) Trackside Equipment (aka NR/GN/SIG/19048)
$24.3
NR TI 048 ISSUE 1
Published Date: 10/01/2006
TPWS Loops - Incorrect Re-Installation following Pway Work
$5.7
NR NR/L3/INV/0001 ISSUE 6
Published Date: 12/04/2010
Introduction to and Contents of the Reporting and Investigation Manual
$7.5

Best-Selling Products

NIST HDBK 150
Published Date: 07/01/2016
National Voluntary Laboratory Accreditation Program Procedures and General Requirements
$14.1
NIST HDBK 150
Published Date: 02/01/2006
National Voluntary Laboratory Accreditation Program Procedures and General Requirements
$16.2
NIST HDBK 44
Published Date: 01/01/2018
Specifications, Tolerances, and Other Technical Requirements for Weighing and Measuring Devices
$36
NIST NISTIR 6969
Published Date: 09/01/2014
Selected Laboratory and Measurement Practices and Procedures to Support Basic Mass Calibrations
$21.6
NIST NISTIR 7628
Published Date: 09/01/2014
Guidelines for Smart Grid Cybersecurity Volume 1 - Smart Grid Cybersecurity Strategy, Architecture, and High-Level Requirements
$39.6