Name:
NR NR/GN/TRK/059 ISSUE 1 PDF
Published Date:
06/03/2017
Status:
[ Active ]
Publisher:
Network Rail
This document is to assist all staff involved with the specification, design, installation, introduction into operational use and maintenance of Switch and Crossings that are to be renewed. It is a guide that, if followed, will support good construction and maintenance techniques so that the best possible quality and performance is obtained for the renewed asset and through its operational life.
This document covers, S&C Specification, Design, Stage-works, Inspection, Track Components, Materials Handling, Setting Out, Formation and Ballast, Ramping in and out, Split Bearers, Use of Cranes, PEMs/LEMs, Lifting and Packing, Design Run in/Run out, Stressing S&C, Welding, Tamping, Hand-back, useful Links.
The document is aligned to the relevant Network Rail Company Standards applicable to track renewals and the governance that surrounds it and is designed to support those documents, not replace them.
Purpose
This document forms part of a comprehensive set of resources available to the Supply Chain Community involved in the Specification, Design, Manufacture and Installation of Switch and Crossing on Network Rail Controlled Infrastructure. Its aim is to provide instruction, reference, guidance and training in the fulfilment of providing a consistent and quality service in the delivery of Switch and Crossings to our customers.
| Edition : | 1 |
| File Size : | 1 file , 1.9 MB |
| Number of Pages : | 58 |
| Published : | 06/03/2017 |