NR NR/L1/XNG/100 ISSUE 2 PDF

NR NR/L1/XNG/100 ISSUE 2 PDF

Name:
NR NR/L1/XNG/100 ISSUE 2 PDF

Published Date:
03/07/2020

Status:
[ Revised ]

Description:

Level Crossing Asset Policy

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
PDF ONLY

2.1 General

 

The policy supports the two top level crossing risk event bow ties:

 

• Animal,vehicle, object or person on the line at risk of collision; and

 

•Incident on or near level crossing not involving a railway vehicle.

 

The policy provides guiding principles which relate to all of the controls identified in the bow-ties and the level 2 Level Crossing Engineering risk ascaptured in the STE

EnterpriseRisk Register (ERR):

• Failure to deliver and implement an effective level crossing asset management framework leading to a serious safety incident, non-compliance

to legislation, prosecution and significant rise in programme costs.

 

The level crossing asset policy is aligned to and consistent withthe Network Rail 10-year level crossing safety strategy.

 

Practical examples of the application of the policy are provided in appendix A.

 

The policy applies to all employees and others engaged inactivities connected with any aspect of a level crossing asset life cycle.

 

The policy applies to the whole the level crossing estate. Itcovers passive, e.g.footpath and user worked level crossings and active, e.g.automatic and manually

controlled level crossings.

 

2.2 Responsibilities

The policy is applicable particularly to Route Level Crossing Managers and Route Asset Managers, Track, Signals, Electrical Power and posts in the route accountable

for lineside. It also applies to the equivalent posts in Network Rail Telecom.

 

The level crossing asset policy, its associated reference documents and policy application guide, see appendix A, should be referred to when preparing Route Business plans.

 

2.3 Line of sight to asset management core principles and Network Rail objectives

All assetmanagement interventions defined in this policy are aligned to the principlesdefined in the Network Rail asset management policy and to the objective

defined inthe Network Rail asset management strategy, see figure 1. They:

a) are based on minimising whole life, whole system costs;

b) are underpinned by appropriate facts from enhanced information;

c) define the most appropriate approach to asset maintenance inspection and renewal,supported by reliability, availability, maintainability and safety specifications;

d) define a risk-based approach to determining intervention requirements to specifylevels of reliability;

e) define resilience requirements to a specified range of weather conditions, takingaccount of emerging knowledge of climate change; and

f) define how sustainable development requirements are to be addressed.

 

Purpose

 

The purpose of this document is to specify the asset policy for the whole of the Network Rail Level Crossing estate.

 

The Level Crossing asset policy seeks to optimise the performance, risk and cost of ownership of the Level Crossing estate across all of its life cycle stages from concept

to disposal to deliver minimum whole life cost.

 

The policy is structured around the six main subject areas and identified in theInstitute of Asset Management document ‘Anatomy of Asset Management’:

•strategy and planning;

• assetmanagement decision-making;

• lifecycle delivery;

• asset information;

•organisation and people; and

• riskand review.

 

The Institute of Asset Management guidance is recognised as best practice against which Network Rail is measured by the Office of Rail and Road, ‘The Regulator’.

 

 

 

 

 

 

 


Edition : 2
File Size : 1 file , 920 KB
Number of Pages : 58
Published : 03/07/2020

History

NR NR/L1/XNG/100 ISSUE 3
Published Date: 09/04/2021
Level Crossings Asset Policy
$24.3
NR NR/L1/XNG/100 ISSUE 2
Published Date: 03/07/2020
Level Crossing Asset Policy
$24.3
NR NR/L1/XNG/100 ISSUE 1
Published Date: 06/04/2016
Level Crossing Asset Management Policy
$24.3

Related products

NR NR/L3/RMVP/0201/CAL405 ISSUE 1
Published Date: 03/05/2011
Calibration of Rail Depth Gauges
$5.7
NR NR/L3/INI/P3M/125 ISSUE 1
Published Date: 09/02/2017
Governance for Railway Investment Projects (GRIP) - Closing a Project
$13.2
NR NR/L2/OTK/5100/MOD01 ISSUE 5
Published Date: 09/03/2022
Boundary Measure Management Manual: Boundary Measure Inspection and Evaluation
$18.6
NR NR/L2/SIG/11766/A010
Published Date: 01/01/1980
Aster and Aster21 Track Circuit Manual: The Aster Type 'U' Jointless Track Circuits for Non-Electrified Lines
$24.3

Best-Selling Products

EEC 00/14/EC
Published Date: 05/08/2000
DIRECTIVE 2000/14/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 8 May 2000 on the approximation of the laws of the Member States relating to the noise emission in the environment by equipment for use outdoors
$21.6
EEC 1068/97/EC
Published Date: 06/12/1997
Commission Regulation (EC) No 1068/97
$6
EEC 1073/2000/EC
Published Date: 05/19/2000
Commission Regulation (EC) No 1073/2000
$6
EEC 1179/94/EC
Published Date: 05/25/1994
Commission Regulation (EC) No 1179/94
$3