NR NR/L2/CIV/191/08 ISSUE 2 PDF

NR NR/L2/CIV/191/08 ISSUE 2 PDF

Name:
NR NR/L2/CIV/191/08 ISSUE 2 PDF

Published Date:
06/03/2023

Status:
[ Active ]

Description:

Mining Manual: Inspection of Working Underground Mines

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This module applies to the inspection of working underground mines.

This module applies to the Technical Authority – Principal Mining Engineer (PME) and the Route Asset Manager – (Geotechnical) (RAM (G)).

This module does not cover:

a) the inspection of abandoned underground mines (refer to NR/L2/CIV/191/07);

b) the inspection of surface mines and tips (refer to NR/L2/CIV/191/03);

c) natural cavities created by dissolution or erosion;

d) subterranean spaces which are not mine workings.

Purpose 

This module mitigates the risk of loss of track geometry or support from working underground mines. 

Inspection of working underground mines is one of the risk mitigation options for assessing underground mining hazards adjacent to, or beneath, the operational railway. 

NOTE: The Mines (Working Facilities and Support) Act 1974 may afford Network Rail (NR) the right to examine working underground mine workings. 


Edition : 2
File Size : 1 file , 490 KB
Number of Pages : 21
Published : 06/03/2023

History

NR NR/L2/CIV/191/08 ISSUE 2
Published Date: 06/03/2023
Mining Manual: Inspection of Working Underground Mines
$18.6
NR NR/L2/CIV/191/08 ISSUE 1
Published Date: 03/07/2020
Mining Manual: Inspection of Working Underground Mines
$18.6

Related products

NR NR/L2/RSK/290 ISSUE 2
Published Date: 09/04/2021
Business Continuity Management (BCM) (aka NR/L2/OPS/290)
$13.2
NR NR/SP/TRK/8011 ISSUE 1
Published Date: 12/01/2005
Management of Pan 8 & Lockspiked Track
$7.5
NR BRS-SM 239 ISSUE C
Published Date: 08/29/1974
Rail Connection Complete with Fishplate End for F/B Detector Tie Bar
$5.7
NR NB 170 ISSUE 1
Published Date: 03/08/2019
Clamp-Lock Switch Assemblies
$5.7

Best-Selling Products

DIN/TS 1187-2 - DRAFT
Published Date: 01/01/2024
Draft Document - Unplasticized polyvinyl chloride (PVC-U) drainpipes - Part 2: Guidance for the assessment of conformity
$9.156
DIN/TS 1187-2
Published Date: 07/01/2024
Unplasticized polyvinyl chloride (PVC-U) drainpipes - Part 2: Guidance for the assessment of conformity
$9.156
DIN/TS 13283
Published Date: 09/01/2023
Biotechnology - Biobanking - Requirements for sample certificates for biological material and associated data; Text in German and English
$14.388
DIN/TS 14530-29
Published Date: 10/01/2022
Fire-fighting vehicles - Part 29: Supplementary requirements for pump water tankers for vegetation fire-fighting TLF 2000-V, TLF 3000-V, TLF 4000-V
$16.023
DIN/TS 16961-3
Published Date: 08/01/2024
Thermoplastic pipes and fittings with profiled wall and smooth pipe inside - Part 3: Assessment of conformity; Text in German and English
$22.563
DIN/TS 18004
Published Date: 10/01/2022
Use of building products in construction works - Test methods for aggregates for concrete according to DIN 1045-2
$16.023