NR NR/L2/ELP/21087 ISSUE 10 PDF

NR NR/L2/ELP/21087 ISSUE 10 PDF

Name:
NR NR/L2/ELP/21087 ISSUE 10 PDF

Published Date:
06/03/2023

Status:
[ Revised ]

Description:

Specification of Maintenance Frequency and Defect Prioritisation of Overhead Line Electrification Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
PDF ONLY

This specification applies to all persons responsible for planning or undertaking preventive or reactive inspection and maintenance activities on 25 kV a.c. or 1.5 kV & 750V D.C. overhead line electrification equipment.

Purpose 

This specification defines the required delivery frequency of maintenance work activities on Overhead Line Electrification Equipment by detailing the asset technical requirements to produce the optimum frequencies for inspection and defect removal, maximising availability through Risk Based Maintenance.


Edition : 10
File Size : 1 file , 3.2 MB
Number of Pages : 94
Published : 06/03/2023

History

NR NR/L2/ELP/21087 ISSUE 11
Published Date: 12/02/2023
Specification of Maintenance Frequency and Defect Prioritisation of Overhead Line Electrification Equipment
$24.3
NR NR/L2/ELP/21087 ISSUE 10
Published Date: 06/03/2023
Specification of Maintenance Frequency and Defect Prioritisation of Overhead Line Electrification Equipment
$24.3
NR NR/L2/ELP/21087 ISSUE 9
Published Date: 06/06/2020
Specification of Maintenance Frequency and Defect Prioritisation of Overhead Line Electrification Equipment
$24.3
NR NR/L2/ELP/21087 ISSUE 8
Published Date: 09/01/2018
Specification of Maintenance Frequency and Defect Prioritisation of Overhead Line Electrification Equipment
$35.4

Related products

NR NR/L3/ELP/27240/NR/DIST C25H ISSUE 2
Published Date: 03/01/2017
Routine Maintenance of DC High Speed Circuit Breaker Secheron UR36 ED 71S & UR40 ED 71S
$5.7
NR NR/EPF/OLE/009 ISSUE 1
Published Date: 09/01/2014
Authorised OTP Work Plan Form
$5.7
NR TWI 2S055 ISSUE 2
Published Date: 03/02/2024
How to Fit the Progress Rail Universal Lockable Scotch Assembly to Secure Switches Out of Use
$5.7
NR RT/E/WI/27074 ISSUE 1
Published Date: 12/04/2004
Instruction for Maintenance of Free Breathing & Sealed Booster Transformers (aka RT/WI/E/27074)
$13.2

Best-Selling Products

NATO AACP-02.1
Published Date: 07/09/2019
COUNTRY POINTS OF CONTACT
NATO AACP-02
Published Date: 07/09/2019
GUIDELINES FOR MUTUAL PROVISION OF CONTRACT AUDITS
NATO AACP-1
Published Date: 01/01/1989
GUIDANCE FOR THE DRAFTING OF MOUS AND PROGRAMME MOUS - BASIC CONSIDERATIONS CHECKLIST
NATO AACP-2 VOL 10
Published Date: 02/14/2012
GUIDELINES FOR MUTUAL PROVISION OF CONTRACT AUDITS - VOLUME 10
NATO AACP-2 VOL 1
Published Date: 09/01/1994
GUIDELINES ON CONTRACTUAL TERMS FOR FEASIBILITY STUDY WORK - VOLUME 1
NATO AACP-2 VOL 2
Published Date: 09/01/1994
GUIDELINES ON CONTRACTUAL TERMS FOR PROJECT DEFINITION AND DESIGN AND DEVELOPMENT - VOLUME 2