NR NR/L2/ELP/21087 ISSUE 11 PDF

NR NR/L2/ELP/21087 ISSUE 11 PDF

Name:
NR NR/L2/ELP/21087 ISSUE 11 PDF

Published Date:
12/02/2023

Status:
[ Active ]

Description:

Specification of Maintenance Frequency and Defect Prioritisation of Overhead Line Electrification Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
PDF ONLY

This specification applies to all persons responsible for planning or undertaking preventive or reactive inspection and maintenance activities on 25 kV a.c. or 1.5 kV & 750V D.C. overhead line electrification equipment.

Purpose

This specification defines the required delivery frequency of maintenance work activities on Overhead Line Electrification Equipment by detailing the asset technical requirements to produce the optimum frequencies for inspection and defect removal, maximising availability through Risk Based Maintenance.


Edition : 11
File Size : 1 file , 4.2 MB
Number of Pages : 95
Published : 12/02/2023

History

NR NR/L2/ELP/21087 ISSUE 11
Published Date: 12/02/2023
Specification of Maintenance Frequency and Defect Prioritisation of Overhead Line Electrification Equipment
$24.3
NR NR/L2/ELP/21087 ISSUE 10
Published Date: 06/03/2023
Specification of Maintenance Frequency and Defect Prioritisation of Overhead Line Electrification Equipment
$24.3
NR NR/L2/ELP/21087 ISSUE 9
Published Date: 06/06/2020
Specification of Maintenance Frequency and Defect Prioritisation of Overhead Line Electrification Equipment
$24.3
NR NR/L2/ELP/21087 ISSUE 8
Published Date: 09/01/2018
Specification of Maintenance Frequency and Defect Prioritisation of Overhead Line Electrification Equipment
$35.4

Related products

NR BRS-SM 440/G6 ISSUE B
Published Date: 08/05/1994
Signal Equipment Framework Small Inter. Relay Rail & Plate for Apparatus Cases & REB's
$5.7
NR TWI 3L007 ISSUE 1
Published Date: 03/01/2005
How to Manage Risks Associated with Lineside Developments
$5.7
NR TEF 3026 ISSUE 1
Published Date: 12/01/2008
Tamping/Lining EPS Site Hand Back Check Form
$5.7
NR RT/E/S/40013 ISSUE 1
Published Date: 02/01/1996
Core Maintenance Specification for Ventilation/Extraction & Air Conditioning Units in Depots & Stations
$13.2

Best-Selling Products

ABS 1 PART 7
Published Date: 07/01/2022
Rules for Survey After Construction Part 7
ABS 109 PART 3
Published Date: 01/01/2023
Rules for Building and Classing Light Warships, Patrol and High-Speed Naval Vessels Part 3 Hull Construction and Equipment
ABS 151
Published Date: 09/01/2021
Guide for Vessels Operating In Low Temperature Environments
ABS 151
Published Date: 01/01/2024
Guide for Vessels Operating In Low Temperature Environments
ABS 151
Published Date: 01/01/2015
GUIDE FOR VESSELS OPERATING IN LOW TEMPERATURE ENVIRONMENTS
$7.2
ABS 158
Published Date: 10/01/2018
GUIDE FOR THE INVENTORY OF HAZARDOUS MATERIALS
$6