NR NR/L2/ELP/21087 ISSUE 9 PDF

NR NR/L2/ELP/21087 ISSUE 9 PDF

Name:
NR NR/L2/ELP/21087 ISSUE 9 PDF

Published Date:
06/06/2020

Status:
[ Revised ]

Description:

Specification of Maintenance Frequency and Defect Prioritisation of Overhead Line Electrification Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
INACTIVE FOR NEW DESIGN * PDF ONLY

This specification applies to all persons responsible for planning or undertaking preventive or reactive inspection and maintenance activities on 25 kV a.c. or 1.5 kV & 750V D.C. overhead line electrification equipment.

Purpose

This specification defines the required delivery frequency of maintenance work activities on Overhead Line Electrification Equipment by detailing the asset technical requirements to produce the optimum frequencies for inspection and defect removal, maximising availability through Risk Based Maintenance.


Edition : 9
File Size : 1 file , 5.4 MB
Number of Pages : 92
Published : 06/06/2020

History

NR NR/L2/ELP/21087 ISSUE 11
Published Date: 12/02/2023
Specification of Maintenance Frequency and Defect Prioritisation of Overhead Line Electrification Equipment
$24.3
NR NR/L2/ELP/21087 ISSUE 10
Published Date: 06/03/2023
Specification of Maintenance Frequency and Defect Prioritisation of Overhead Line Electrification Equipment
$24.3
NR NR/L2/ELP/21087 ISSUE 9
Published Date: 06/06/2020
Specification of Maintenance Frequency and Defect Prioritisation of Overhead Line Electrification Equipment
$24.3
NR NR/L2/ELP/21087 ISSUE 8
Published Date: 09/01/2018
Specification of Maintenance Frequency and Defect Prioritisation of Overhead Line Electrification Equipment
$35.4

Related products

NR NR/L3/MTC/MG0213 ISSUE 23
Published Date: 09/07/2024
Index of Standard Maintenance Forms
$13.2
NR BRS-SM 694/3
Published Date: 10/01/1981
Reed Track Circuit Cable Clips Split Sleeve for Fixing to Concrete Sleepers
$5.7
NR NR/L3/TRK/003 ISSUE 43
Published Date: 06/03/2023
Index of Track Engineering Forms
$18.6
NR TPWS/TI/026 ISSUE 1
Published Date: 03/01/2002
Train Protection and Warning System Project: TPWS Configuration Reporting
$7.5

Best-Selling Products

STI/SPFA R972
Published Date: 12/01/2010
Recommended Practice for the Addition of Supplemental Anodes to sti-P3 USTs (R972)
$9
STI/SPFA SP001
Published Date: 01/01/2018
Standard for the Inspection of Aboveground Storage Tanks
$58.5
STI/SPFA SP001
Published Date: 09/01/2011
Standard for the Inspection of Aboveground Storage Tanks
$51
STI/SPFA SP001
Published Date: 02/01/2024
Standard for the Inspection of Aboveground Storage Tanks
$58.5