NR NR/L2/ELP/CTM015/008 ISSUE 2 PDF

NR NR/L2/ELP/CTM015/008 ISSUE 2 PDF

Name:
NR NR/L2/ELP/CTM015/008 ISSUE 2 PDF

Published Date:
06/01/2019

Status:
[ Active ]

Description:

Competence & Training in DC Conductor Rail Engineering - DCCR 8: Manually Switch the Electrical Supply to DC Conductor Rail Equipment to Meet Defined Requirements

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This competence standard applies in all circumstances where any person is required to manually switch the electrical supply to the DC Conductor Rail Equipment on Network Rail controlled infrastructure.

The level and extent of responsibility includes their own safety and that of others who might be affected by their work. The Person in Scope is expected to refer to others for authorisation when required, responsible for the implementation of the instructions and working within set procedures and specifications. The Person in

Scope is responsible for the quality of their completed work. This competence standard is used to assess the competence of people undertaking electrical safety activities associated with the DC Conductor Rail System Infrastructure.

Purpose

The purpose of this competence standard is to define the first of the three parts for the competence requirements for persons required to undertake Level B (Competent Person) DC Conductor Rail duties when working on or having access to live DC Conductor Rail Equipment.


Edition : 2
File Size : 1 file , 180 KB
Number of Pages : 6
Published : 06/01/2019

History


Related products

NR NR/L3/MTC/PL0175/10 ISSUE 4
Published Date: 09/04/2010
Infrastructure Maintenance Planning Handbook
$5.7
NR NR/L2/SIG/11201/MOD A3-2 ISSUE 1
Published Date: 06/02/2018
Signalling Design Handbook: Project Requirements for Signalling Schemes
$13.2
NR NR/GN/CIV/100/03 ISSUE 2
Published Date: 12/02/2023
Strategic Design Manual: Station Capacity Planning
$35.4
NR NR/L2/P3M/220 ISSUE 2
Published Date: 12/03/2022
Project Acceleration in a Controlled Environment (PACE) - Manage Integration
$18.6

Best-Selling Products

Software Engineering Classics
Published Date: 11/01/1998