NR NR/L2/MTC/EP0234 ISSUE 1 PDF

NR NR/L2/MTC/EP0234 ISSUE 1 PDF

Name:
NR NR/L2/MTC/EP0234 ISSUE 1 PDF

Published Date:
03/05/2022

Status:
[ Revised ]

Description:

Lineside Wheel Impact Load Detector (WILD) and Radio Frequency Identification (RFID) Tag Reader Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This document applies to WILD and associated RFID tag reader installations for:

a) the specification process, including the requirements for site and plant selection;

b) design;

c) installation;

d) testing and commissioning;

e) system operation and response;

f) maintenance; 

g) training and competence;

h) protection during track works;

i) maintainability, reliability, and availability; and

j) decommissioning.

This document applies to:

a) all parties involved with the specification, design, installation, testing and commissioning, system operation and response, maintenance, and decommissioning of WILD and associated RFID tag reader equipment installed on Network Rail infrastructure, including any train or vehicle operating on Network Rail infrastructure that activates the WILD equipment; and

b) all WILD and associated RFID tag reader equipment installed on Network Rail infrastructure.

Purpose

This document provides a process to reduce: 

a) the risk of Wheel Impact Load Detector (WILD) and associated Radio Frequency Identification (RFID) tag reader equipment being incorrectly specified, designed, installed, tested, operated, maintained, and decommissioned; and 

b) as far as reasonably practicable, the risk of a catastrophic incident occurring resulting from damaged or irregular wheel condition.


Edition : 1
File Size : 1 file , 33 MB
Number of Pages : 39
Published : 03/05/2022

History


Related products

NR NR/L2/TEL/30135 ISSUE 6
Published Date: 09/04/2021
Video Surveillance Systems (VSS)
$18.6
NR NR/L2/MTC/PL0175 ISSUE 8
Published Date: 12/04/2021
Infrastructure Maintenance Planning Handbook
$13.2
NR BRS-SW 67-B1 ISSUE 2
Published Date: 12/04/2004
Typical Free Wired Interlocking Circuits - Remote Control Override Signal Box to Interlocking Link
$5.7
NR BR 1901 ISSUE A
Published Date: 04/01/1986
Solid State Interlocking Lineside Points Module
$18.6

Best-Selling Products

NTCIP 1101:1996
Published Date: 1996
Simple Transportation Management Framework
$27.6
NTCIP 1102:2004
Published Date: 2005
Octet Encoding Rules (OER) Base Protocol
$41.1
NTCIP 1103 - 2010
Published Date: 2010
Transportation Management Protocols (TMP)
$61.2
NTCIP 1104 v01
Published Date: 2009
Center-to-Center Naming Convention Specification
$21.6
NTCIP 1201:2005
Published Date: 01/01/1997
Global Object (GO) Definitions
$48.6
NTCIP 1201:2011
Published Date: 04/01/2011
Global Object (GO) Definitions
$62.1